My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0528038
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 9:54:09 AM
Creation date
9/26/2019 8:57:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0528038
PE
2950
FACILITY_ID
FA0018998
FACILITY_NAME
NCPA LODI ENERGY CENTER
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1626
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.7 NOISE <br /> TABLE 5.7-9 <br /> Noise Levels from Common Construction Equipment at Various Distances <br /> Typical Sound Typical Sound Typical Sound <br /> Pressure Level at Pressure Level at Pressure Level at <br /> Construction Equipment 50 feet(dBA) 1,500 feet(dBA) 4,000 feet(dBA) <br /> Pile Drivers(20,000-32,000 ft-lbs./blow) 104 74 65 <br /> Dozer(250-700 hp) 88 58 49 <br /> Front End Loader(6-15 cu.yds.) 88 58 49 <br /> Trucks(200-400 hp) 86 56 47 <br /> Grader(13 to 16 ft. blade) 85 55 46 <br /> Shovels (2-5 cu. yds.) 84 54 45 <br /> Portable Generators(50-200 kW) 84 54 45 <br /> Derrick Crane(11-20 tons) 83 53 44 <br /> Mobile Crane(11-20 tons) 83 53 44 <br /> Concrete Pumps (30-150 cu.yds.) 81 51 42 <br /> Tractor(3/4 to 2 cu. yds.) 80 50 41 <br /> Unquieted Paving Breaker 80 50 41 <br /> Quieted Paving Breaker 73 43 34 <br /> Noise generated during the testing and commissioning phase of the project is not expected <br /> to be substantially different from that produced during normal full-load operation. Starts <br /> and abrupt stops are more frequent during this period, but they are usually short lived. <br /> 5.7.3.2.2 Construction Vibration <br /> Construction vibrations can be divided into three classes,based on the wave form and its <br /> source (see Table 5.7-10). Pile driving, if required,will be limited to daytime hours in the <br /> event a complaint is received and will be of short duration;therefore,no mitigation is <br /> required. <br /> TABLE 5.7-10 <br /> Construction Vibrations <br /> Wave Form Example Source <br /> Impact Impact pile driver or blasting <br /> Steady state Vibratory pile driver <br /> Pseudo steady state Double acting pile hammer <br /> 5.7.3.2.3 Worker Exposure to Noise <br /> Worker exposure levels during construction of the LEC will vary depending on the phase of <br /> the project and the proximity of the workers to the noise-generating activities. Construction <br /> noise is potentially harmful to the health and hearing of construction workers. As required <br /> SAC/371322/08234009(LEC_5.7_NOISE.DOC) 5.7-13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.