|
FE87Z2 p7 THU 09;52 An SA -9 VALLEY AIR DIST FAX N0, 2095576475 P. 15
<br /> p
<br /> Facility-wide Requirements for N 2697-0-2 (continued)
<br /> e4o;'4
<br /> 37. The permittee shall submit certifications of compliance with the terms and standards contained in Title V Permits,
<br /> including emission limits,standards and work.practices,to the District and the BPA.annually(or more frequently as
<br /> spociiiad in an applicable requirement or as specified by the District). The certification shall include the identif cation
<br /> of each permit term or condition,the compliance,smtus,whether compliance was continuous or intermittent,the
<br /> methods used for determining the compliance status,and any other facts required by the District to determine the
<br /> compliance status of the source,[District Rule 2520,9.161 Federally Enforceable Through Title V Permit
<br /> 38, The permittee shall submit an application for Title V permit renewal to the District at least six months,but not greater
<br /> than 18 months,prior to the permit expiration date.[District Rule 2520,5.2]Federally Enforceable Through Title V
<br /> Permit
<br /> 39, When a term is not defined in a Title V permit condition,the definition in the rule cited as the origin and authority for
<br /> the condition ni a Title V permits shall apply.(District Rule 2520,9,1.1)Federally Enforceable Through Title V
<br /> 1'errnit
<br /> 40. Compliance with permit conditions in the Title V"permit shall be deemed in compliance with the following outdated
<br /> SIP requirements:Rule 401(Madera,Fremo,Kern.,kgs,San Joaquin,StanislaPs,Tulare artd Merced),Rude 110
<br /> (Fresno,Staraislaus,San Joaquin),Rule 109(Merced),Rule 113 (Madera),and Rule 111 (Kern,Tulare,Kings').A
<br /> permit shield is granted from these requirements.[District Rule 2520, 139j Federally Enforceable Through Tittle V
<br /> Fermi(
<br /> 41, Compliance with permit conditions in the Title V permit shall be deemed in compliance with the following applicable
<br /> requirements; SJVUAPCD Rules 1100,sections 6.1 and 7.0(12/17192);2010,sections 3,0 and 4.0(12/17/92):2031
<br /> (12,/17/92);.2040(12/17192);2070,section 7.0(12/17/92);2090(12117/92);4101 (11/15/01);46DI, sections 5.1-5.2,
<br /> 5.3,5.8 and 8.0(10/31/01);8021 (11115101);8031 (11/15/01); 8041 (11115/01);8051 (I I/15/O1); go61 (11/15101);and
<br /> 8071 (11115101). A permit shield is granted from these requirements.[District Rule 2520, 13.21 Federally Enforceable
<br /> Through Title V Permit
<br /> 42. The reporting Periods far the Report of Req
<br /> Monitoring stud the Compliance certification Report begin Janrtaty i
<br /> of each year,unless alternative dates are approved by the District Compliance Division These reports are due within
<br /> 30 days alter the end of the reporting period.[District Rule 2520]Federally Enforceable Through Title V Pernvt
<br /> These terms and conditions are part of the Facility-wide Permit to opoIiato-
<br /> FadityNnma_ NORTHERNCAWFORNIAPOWER
<br /> Location, 127$1 N THORNTON RD,LODi,CA 96241
<br /> TOO97a2:buen 2WIiA1FM-$Ly0Mi0N
<br />
|