Laserfiche WebLink
i <br /> C <br /> 2. Tubing and Packer Specifications Injection willtake <br /> place only through the 4 1/2 inch tubing with a Baker <br /> Lok-Set Packer set within the long string casing at <br /> approximately 892. feet above the injection zone. The <br /> tubing -and packers shall be maintained to prevent the <br /> -movement of fluids into an, underground source of drinking <br /> water. -The tubing and packers shall be corrosion- <br /> resistant and of' sufficient strength to resist wellbore <br /> pressures developed during the life of the well. The <br /> caning/tubing annulus will be filled with corrosion <br /> inhibited fluid. Injection between-. the outermost casing <br /> and the wellbore is prohibited. <br /> 3 . Injection Intervals -Injection into 'the intended -zone is <br /> through perforations made through the steel casing and <br /> cement into the zone of injection by 11-gram jet charges <br /> at 4 shots per foot; 120 degrees phasing, in 3-1/8 - inch <br /> liollow st'eel°" cArrier guns. Perforations are- 0. 31 inch <br /> diameter holes penetrating 18.9 inches. Injection shall <br /> `be permitted-for'--the lower;`Domengine Formation, between <br /> 4220 feet` and 4559 feet below"the ground- surface. <br /> Alteration of the injection" perforations and other rework <br /> operations must= be properly reported (EPA Form 7520-12) <br /> and the well must demonstrate mechanical integrity before <br /> injection is authorized.- <br /> 4 . Monitoring Devices—The- operator- shall install and <br /> maintain in -good operating condition: <br /> (a) A tap on the suction line prior to the injection <br /> pump and the wellhead for the purpose of obtaining <br /> representative samples of• the injection fluids; <br /> (b) A pressure, temperature and flow transmitter to <br /> measure and transmit to a- computer=based data <br /> acquisition system the parameters lited in Part II, <br /> Section D. 4 of this permit. The flow transmitter <br /> and totalizer- shall yield measured cumulative <br /> volumes that are certified for a deviation accuracy <br /> of five (5) percent or less throughout the range of <br /> injection rates allowed by the permit; and <br /> " (c) A pressure -gauge designed to provide (1) a full <br /> M� ` ��''� � pressure range of 100 percent greater than the <br /> ��g� anticipated operating pressure, and (2) a certified <br /> deviation accuracy of five (5) percent or less. <br /> 5. Proposed Changes and Workovers The permittee shall give <br /> advance notice to the Director, as soon as possible, of <br /> Page 6 of 31 <br /> UIC Permit #CA194000002 <br />