My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS UIC PERMIT APP
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0528038
>
ARCHIVED REPORTS UIC PERMIT APP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 9:59:35 AM
Creation date
9/26/2019 9:22:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
UIC PERMIT APP
RECORD_ID
PR0528038
PE
2950
FACILITY_ID
FA0018998
FACILITY_NAME
NCPA LODI ENERGY CENTER
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1019
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
different procedures followed. <br /> 4. Cessation of Infection Activities After a cessation of <br /> injection of two (2) years, the permittee shall plug and <br /> abandon the well in accordance with the Plugging and <br /> Abandonment Plan, unless it: <br /> (a) Provides notice to the Director; and <br /> (b) Has demonstrated that the well will be used in the <br /> future, and <br /> (c) Has described actions or procedures, satisfactory to <br /> the Director, that will be taken to ensure that the <br /> well will not endanger USDWs during the period of <br /> temporary abandonment. <br /> Y. FINANCIAL RESPONSIBILITY <br /> 1. Demonstration of Financial Responsibility The permittee <br /> is required to, maintain financial responsibility and <br /> resources to close, plug, and abandon the underground <br /> injection operation as provided in the plugging and <br /> abandonment-plan. .- <br /> (a) The -permittee -shall maintain a bond rating within <br /> the- four highest categories of standard aid Poor' s <br /> (AAA, AA, .A, or BB) or Moody's (Aaa, Aa, A, or Baa) . <br /> If the most recent bond rating does not fall within <br /> the four- highest categories, then the permittee <br /> shall post a financial instrument such as a bond, <br /> letter of credit, or a trust fund to guarantee <br /> closure of the well. <br /> (bs) The permittee must provide proof to the EPA of its <br /> bond rating or renewal every year by March 31. <br /> 2. Insolvency of Financial Institution The permittee must <br /> submit an- instrument of. financial responsibility <br /> acceptable to the Director within sixty (60) days after <br /> either of the following events occur: <br /> (a) the- institution issuing the bond or financial <br /> • instrument files for bankruptcy; or <br /> (b) the authority of the trustee institution to act as <br /> Page 15 of 31 <br /> UIC Permit #CA194000002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.