My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS UIC PERMIT APP
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0528038
>
ARCHIVED REPORTS UIC PERMIT APP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 9:59:35 AM
Creation date
9/26/2019 9:22:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
UIC PERMIT APP
RECORD_ID
PR0528038
PE
2950
FACILITY_ID
FA0018998
FACILITY_NAME
NCPA LODI ENERGY CENTER
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1019
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPENDIX C - PLUGGING AND ABANDONMENT PLAN <br /> Upon completion of injection activities the well will be abandoned <br /> according to State and Federal regulations to ensure protection of <br /> USDW sources. <br /> The proposed plugging and abandonment plan is as follows: <br /> 1. Move in and rig up a workover/completion rig, remove the <br /> wellhead, and install and activate BOPE. Run in hole and unseat <br /> the packer at 3342 feet and pull the 4-1/2 inch Tubing string and <br /> packer out of the well. <br /> 2. After sufficient fresh water has been injected to displace <br /> all the wellbore fluids, check for fill to confirm the wellbore is <br /> open to a depth of at least 100 feet below the 5 inch Liner hanger, <br /> to about 3460 feet. If not, bail well down to that depth. <br /> 3. Run open-ended 2-3/8 inch tubing with 1200 feet of 1-1/4 <br /> inch 10 RND, EUE, N-80 tubing stringer to at least 3460 feet, but <br /> as deep as possible down to a maximum depth of 4567 feet, ..and <br /> cement through tubing a premium cement plug, 'by coordinating the <br /> pumping of cement and gradual withdrawal of -tubing, until the <br /> tubing has been pulled up to depth of 3160 feet, 200 feet above the <br /> liner lap. A 280 cubic foot cement plug will be sufficient to fill <br /> the well from 4567 feet to 3160 feet with almost 100% excess. <br /> 4. Wait on cement for 12 hours, run in hole with tubing tag <br /> top of cement plug, recementing if needed until the plug is <br /> confirmed to extend a minimum of 100 feet above the liner lap. <br /> 5. Pull up to a depth of 100 feet and set a . 400 cubic foot <br /> (about 100% excess) cement plug to the surface. <br /> 6. After removing the BOPE and moving off the rig, cut off <br /> the wellhead and casing at ground level and weld a steel plate at <br /> least 3/8 inch thick to cap off the 7 inch Casing. <br /> The above plugging and abandonment plan has been reasonably <br /> estimated by NCPA to- be about $18, 300. <br />
The URL can be used to link to this page
Your browser does not support the video tag.