My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS UIC PERMIT APP
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0528038
>
ARCHIVED REPORTS UIC PERMIT APP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 9:59:35 AM
Creation date
9/26/2019 9:22:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
UIC PERMIT APP
RECORD_ID
PR0528038
PE
2950
FACILITY_ID
FA0018998
FACILITY_NAME
NCPA LODI ENERGY CENTER
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1019
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 . Mechanical Integrity- <br /> . l <br /> (a) Method for Demonstrating Mechanical Integrity A <br /> demonstration of the absence of significant leaks in <br /> the casing, tubing and/or packer must be made by <br /> performing a tubing/casing annulus pressure test. <br /> This test shall be for a minimum of thirty (30) <br /> minutes at a pressure equal to the maximum allowable <br /> injection pressure. A well passes the mechanical <br /> integrity test if there is_ less than a five (5) <br /> percent decrease/increase %n pressure over the <br /> thirty (30) minute period. -Casing annuli and <br /> injection pressures must be monitored continuously <br /> and the average, maximum, and minimum daily and ' <br /> monthly results are included in the quarterly report <br /> to the director. <br /> (b) Schedule for Demonstrations of Mechanical Integrity <br /> (i) A demonstration of mechanical integrity shall <br /> be made no less frequently than every year from <br /> the effective date of this permit, in <br /> accordance with 40 CFR 146. 8 and paragraph (a) <br /> above. Mechanical integrity shall alsobe <br /> demonstrated any time that a workover is <br /> conducted, the construction of the well is <br /> modified or when loss of mechanical integrity <br /> becomes evident during operation. <br /> (ii) It shall be the permittee's responsibility to <br /> arrange and conduct the mechanical integrity <br /> demonstrations. The permittee shall notify the <br /> Director of its intent to demonstrate <br /> mechanical integrity at least thirty (30) days <br /> prior to each such demonstration. Results' of <br /> the test shall be submitted to the Director as <br /> soon as possible but no later than sixty (60) <br /> days after the demonstration. <br /> (iii) In addition to any demonstration made under <br /> paragraph (i) above, the Director may require a <br /> demonstration of mechanical integrity at any <br /> time during the life of the well. <br /> (c) Loss of Mechanical Integrity If (1) , the well fails <br /> to demonstrate mechanical integrity during a test, <br /> or (2) , a loss of mechanical integrity becomes <br /> evident during operation, or (3) , a significant <br /> change in the annulus or injection pressure occurs <br /> during normal operating conditions, the permittee <br /> shall notify the Director in accordance with Part <br /> Page 8 of 29 <br /> UIC Permit #CA194000002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.