My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS UIC PERMIT APP
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0528038
>
ARCHIVED REPORTS UIC PERMIT APP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 9:59:35 AM
Creation date
9/26/2019 9:22:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
UIC PERMIT APP
RECORD_ID
PR0528038
PE
2950
FACILITY_ID
FA0018998
FACILITY_NAME
NCPA LODI ENERGY CENTER
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1019
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> and would not change its classification. <br /> 6'. Infection Fluid Limitation <br /> (a) The permittee shall not inject any hazardous wastes <br /> as defined by 40 CFR 261, at any time during the <br /> operation of the facility. <br /> (b) 98% of the injection fluid shall consist of brine <br /> reject from_the ultrafiltration units, reverse <br /> osmosis units and the blowdown from the cooling <br /> towers. The other 2% of the liquid wastes intended <br /> for injection will consist of both continuous and <br /> intermittent blowdown from the Heat Recovery <br /> Boilers. <br /> (c) The injection of any fluids other than those <br /> described in paragraph (b) , above, shall be reported <br /> to the Director thirty (30) days prior to the <br /> injection of the substance. Written approval by the <br /> Director is required for change of injection fluids. <br /> 7. Annulus Measurements The annulus between the tubing and <br /> the long string casing will contain approximately 449 <br /> cubic feet (3360 gallons) of treated 3 percent KC1 water <br /> to prevent corrosion and bacterial growth. A minimum <br /> surface annular pressure of 100 psig shall be maintained <br /> at all times. <br /> D. MONITORING, RECORDKEEPING, AND REPORTING OF RESULTS <br /> 1. Injection Well Monitoring Program Samples and <br /> measurements shall be representative of the monitored <br /> activity. The permittee shall utilize the applicable <br /> analytical methods described in Table I of 40 CFR 136. 3, <br /> or in Appendix III of 40 CFR 261, or in certain <br /> circumstances, other methods that have been approved by <br /> the EPA Administrator. Reporting shall consist of <br /> average, maximum, and minimum daily and monthly values <br /> for injection pressure, annular pressure, flow rate, <br /> temperature and volume. <br /> Temperature, annular pressure, and injection pressure <br /> shall be measured at the wellhead. Injection rate/flow <br /> rate shall be measured in the supply line immediately <br /> before the wellhead. <br /> 2. Infection Fluid Monitoring Program Samples and <br /> measurements taken for the purpose of monitoring shall be <br /> Page 10 of 29 <br /> UIC Permit #CA194000002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.