My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS UIC PERMIT APP
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0528038
>
ARCHIVED REPORTS UIC PERMIT APP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 9:59:35 AM
Creation date
9/26/2019 9:22:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
UIC PERMIT APP
RECORD_ID
PR0528038
PE
2950
FACILITY_ID
FA0018998
FACILITY_NAME
NCPA LODI ENERGY CENTER
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1019
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J�SE�IFS. <br /> o R�j� UNITED STATES ENVIRONMENTAL PROTECTION AGENCY <br /> REGION IX <br /> yr4`PA°zti° 75 Hawthorne Street <br /> San Francisco, CA 94105.3901 <br /> Randall Blank <br /> Northern California Power Agency <br /> P.O. Box 1478 <br /> Lodi, CA 95242-1478 <br /> Re: Administrative Review <br /> Class I Underground Injection Control (UIC) Permit Reissuance Application <br /> Dear Mr. Blank: <br /> The United States Environmental Protection Agency,Region 9 (EPA)has received Northern <br /> California Power Agency's (NCPA) application to reissue the nonhazardous Class I UIC permit no. <br /> CA194000002 (Permit). Based on our review,we consider the application to be administratively <br /> complete. <br /> We have begun the Technical Review phase of the permitting process. During this phase, <br /> additional information and clarification of previously submitted information may be requested. <br /> Once we complete our technical evaluation,we will develop a draft permit which will be issued for <br /> a 30-day period of public review. <br /> The annual mechanical integrity testing required under the existing Permit will be postponed <br /> until the effective date of a new permit. However, under 40 C.F.R. §144.37 and 5 U.S.C. 558(c), all <br /> other Permit conditions remain in force until the effective date of a new permit. <br /> Please call Eric Byous of my staff at (415) 972-3531 if you have any questions regarding the <br /> permitting process or this letter. <br /> Sincerely, <br /> 1 <br /> David Albright <br /> Manager, Ground Water Office <br /> Printed on Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.