My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS UIC PERMIT APP
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0528038
>
ARCHIVED REPORTS UIC PERMIT APP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 9:59:35 AM
Creation date
9/26/2019 9:22:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
UIC PERMIT APP
RECORD_ID
PR0528038
PE
2950
FACILITY_ID
FA0018998
FACILITY_NAME
NCPA LODI ENERGY CENTER
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1019
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOURCES ADEN Y OF CALIFORNIA <br /> DEPARTMENT OF CONSERVATION `✓ <br /> DIVISION OF DIL AND GAS No. P 687-266 <br /> REPORT ON PROPOSED OPERATIONS (Meld code) <br /> WELL CLASSIFICATION: Exploratory-New Field (area code) <br /> (new pool code) <br /> _Andy Hauge- Agent -- <br /> MAXUS RXPInRATION CO- (old pool code) <br /> St rPPr, Suite 307 Woodland , California <br /> Sarrartwntn� CA Q5816June 25, 1987 <br /> Your proposal to drill well "Red House Fee" 65-24 <br /> A P.I. No. 077-20496 Section T. 3N R. 5E M.D. B. & M., <br /> --- field, -- area, -- pool, <br /> San Joaquin County, dated 6/25/87 ,receiv 6/25/87has been examined in conjunction with records <br /> filed in this office. <br /> THE PROPOSAL IS APPROVED PROVIDED THAT: <br /> 1. The R-91A"" casing is cemented with sufficient cement to fill behind this casing from <br /> the shoe to the ground surface. <br /> 2. The 511" casing is cemented with sufficient cement to fill behind this casing from <br /> the shoe to at least 500 feet above the uppermost oil or gas zone. <br /> 3. Drilling fluid of a quality and in sufficient quantity to control all subsurface <br /> conditions in order to prevent blowouts is used. <br /> 4. Blowout prevention equipment conforming to Class III B 2M requirements is installed on <br /> the 8-5/8" casing and maintained in operating condition at all times. See Manual <br /> M07 and attached sheet. <br /> 5. Blowout prevention equipment conforming to Class "III" 2 M requirements is installed <br /> on the 5-" casing and maintained in operating condition at all times. See Manual <br /> M07 and attached sheet. <br /> 6. Water with any beneficial use is protect from contamination at all times. <br /> 7. The division is furnished copies of any draw down or back pressure tests performed. <br /> In addition the division will monitor the production for a period of six months and <br /> if anomalous water production is indicat , remedial action will be ordered. <br /> 8. THIS DIVISICN IS NOTIFIED: <br /> a. Before deviating from the proposed ca ing program and/or placing any plugs in the <br /> hole. Additional requirements shall 3e outlined at that time. <br /> b. To witness a test of the installed bl ut prevention equipment prior to drilling <br /> out the shoe of the 8-5/8"casing. The blind/blank rams shall be tested by the <br /> operator prior to calling the Divisi inspector. Test information of the blind/ <br /> blank ram test shall be entered an the tour sheet along with the signature of the <br /> person in charge. <br /> NOTE: 1. Information on file in this office indicates that the base of the useable <br /> fresh water deposits should be encountered at a depth of approximately 500' <br /> 2. This well has been granted confidential status for two years from the <br /> cessation of drilling operations. <br /> Blanket Bond <br /> ^ M. G. M F e I i.Gas Supervisor <br /> RLH:et l <br /> CONFIDENTIAL STATUS _ <br /> cc: J. M. Pachulski,WY �1 �-- By <br /> D. N Supevvlsor <br /> John C. Sullivan <br /> A copy of this report and the proposal must be posted at the well site rlor to commencing operations. <br /> Records for work done under this permit are due within 60 days after the work has been completed <br /> or the operations have been suspended. <br /> OG111 (11/82/DWRR/5M) <br />
The URL can be used to link to this page
Your browser does not support the video tag.