Laserfiche WebLink
SUBMIT IN DUPLICATE <br /> RpOURCaa AGRNCY OF CALIFORNIA <br /> D19FARTM04T OF CONBUVATION <br /> DIVISION OF OIL AND GAS <br /> History of Oil or Gets Wel <br /> Operator Argo Petroleum Corporation Field East Islands County San Joaquin <br /> Well. . Buttes-Rio Blanco #15-77X � 15 T 3N. ._, R SE MD g & M. <br /> . <br /> A.P.I. No. . . 077-20381 Name Harry. Hull . _...._ _... ._. Title _..D1s.t,,..$.up.t.r.. ..... <br /> Date January 4 1982 (tie svb.�, qm) (hesidea•Secretary orAgent) <br /> Signature...../ ....��................ <br /> r <br /> t <br /> 940 E. Santa Clara Street, Ventura, CA ...913010.11. ........... _005.)...5.5.3...5.1.1.1........ <br /> (Address) (Tekpboue Number) <br /> History matt be oomplebe malt detail. Use this form to report al operation dura dry and twft of the well or during redrillin$ <br /> or abe int the�.pili or abandonment inth the dater thereof.Include snch ikM as hob formation test details,amounts <br /> of cement used.top said bopom of ph*%perforation debuk sidetracked hmk, bad 6mb sad i pnxh bion data. <br /> Dau <br /> 10/13/81 Finish MIRU Cal Pacific Rig #3. Spud at 2200 hrs. Drilled 124" hole to 75' . <br /> 10/14/81 Drilled to 140' . Rig SCR failed (22 hrs). Drilled to 614' . Wiped hole to shoe. <br /> Conditioned mud for casing. POOH. <br /> Ran 15 its. 8-5/8" , 24#, K-55, ST&C 8RD casing (from Northern Truck Yard - Full <br /> Amalog inspection). Float shoe at 614' with 1 centralizer per joint for the first <br /> 2 joints. <br /> Rigged up B.J. Cementers. Cemented as follows: 50 cf. of water; 348 cf. class 'G' <br /> cement + 4'% Gel + 3% CaCl2; 100 cf. class 'G' cement + 3% CaCIDisplaced with <br /> 209 cf. Shut in. Had 15 cf. cement returns. C. I .P. at 2311 ;irs. <br /> 10/15/81 Installed wellhead and tested welds to 1000 psi . Nippled up BOP's. Tested blind <br /> rams. RIH. Attempted to test annular - no good. <br /> 10/16/81 Repaired annular preventer. Tested pipe rams, annular and lines. DOG witnessed and <br /> approved. Drilled cement 566' to 614' . Drilled 7-7/8" hole to 1616' . Installed the <br /> mud logger at 614' . <br /> 10/17/81 <br /> to Drilled 7-7/8" hole to 3670' . <br /> 10/18/81 <br /> 10/19/81 Drilled to 3844' . SCR failure - drawworks down. Circulated and repaired SCR. Power <br /> to drawworks at 2030 hrs. Pipe stuck. Worked stuck pipe. <br /> 10/20/81 Worked stuck pipe. Spotted 50 Bbls PS-300 with 50 gal . pipe-LAX at 0500 hrs. ; <br /> 20 Bbls outside, 30 Bbls inside. Moving oil @ 22 Bbls per hour. Pipe free at 1000 <br /> hrs. Circulated out oil and conditioned mud. POOH. Repaired SCR. RIH. Drilled <br /> to 3990' . <br /> 10/21/81 Drilled to 4226' . POOH. Repaired leak in wellhead. RIH and drilled to 4274' . <br /> Repaired SCR. <br /> 10/22/81 Drilled to 4786' . <br /> 10/23/81 Drilled to 4931' . Wiped hole to shoe. Conditioned mud for logs. <br /> Rigged up Schlumberger and logged well as follows: <br /> 00103 (11/80/DWRR/15M) <br />