Laserfiche WebLink
�..J RESOURCES AGENCY OF CALIFORNIA U <br /> DEPARTMENT OF CONSERVATION <br /> DIVISION OF OIL,GAS,AND GEOTHERMAL RESOURCES No. P 601-577 <br /> PERMIT TO CONDUCT WELL OPERATIONS 351 <br /> (field code) <br /> 00 <br /> (area code) <br /> 05 <br /> (new pool code) <br /> Mr.Robert D.Eberts,Agent 05 <br /> SIERRA RESOURCES,INC. (old pool code) <br /> P.O.Box 2788 <br /> Mammoth Lakes,CA 93546-2788 Sacramento, California <br /> November 26,2001 <br /> Your proposal to Rework well "Piacentine" 1-27 <br /> A.P.I.No. 077-20484 ,Section 27 _ ,T. 3N R. 5E M.D. B.&M. <br /> King Island Gas field, any area Mokelumne pool <br /> San Joaquin County,dated 11/10/2001 received 11/16/2001 has been examined in conjunction with records <br /> filed in this office. <br /> THE PROPOSAL IS APPROVED PROVIDED THAT: <br /> 1. Blowout prevention equipment conforming to Class "II" B 3M requirements is installed on the 5-1/2" casing and <br /> maintained in operating condition at all times. See Manual MOT <br /> 2. Wire line operations are conducted through at least a 3M lubricator. <br /> 3. The Division is furnished copies of any draw down or back pressure tests performed. In addition, the Division will <br /> monitor the production for a period of six months and if anomalous water production is indicated,remedial action will be <br /> ordered. <br /> 4. THIS DIVISION IS NOTIFIED: <br /> a. In the event there are any blowouts, fires,serious accidents,or any significant gas or water leaks,they shall be promptly <br /> reported to this district office. <br /> b. Before deviating from the proposed casing programs and/or placing any plugs in the hole. Additional requirements <br /> shall be outlined at that time. <br /> c. To inspect the installed blowout prevention equipment prior to commencing operations. <br /> Blanket Bond <br /> BW/jc <br /> Enc(2) WILLIAM F.G RD,JR.,State Oil and Gas Supervisor <br /> Engineer Bill Wtittkler By <br /> Phone(916) 322-1110 Robert S.Habel,Deputy Supervisor <br /> A copy of this permit and the proposal must be posted at the well site prior to commencing operations. <br /> Records for work done under this permit are due within 60 days after the work has been completed or the operations have been suspended. <br /> OG111 (&WGSR/5M) <br />