My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS UIC PERMIT APP
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0528038
>
ARCHIVED REPORTS UIC PERMIT APP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 9:59:35 AM
Creation date
9/26/2019 9:22:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
UIC PERMIT APP
RECORD_ID
PR0528038
PE
2950
FACILITY_ID
FA0018998
FACILITY_NAME
NCPA LODI ENERGY CENTER
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1019
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIV. o ;t C-%y - Dist. 6 <br /> PIACENTINE #1-27 WELL <br /> WORKOVER PROGRAM N Q V 16 2001 <br /> NOVEMBER 10, 2001 <br /> � WELL INFORMATION Sacramento, Caiffornia <br /> API No: 04-077-20484 FIELD: King Island <br /> I <br /> ELEVATION: All measurements from KB (13' above GL) <br /> (KB-THF = 11 .5' ) <br /> TD: 4900' PBTD: 4715' (bridge plug) <br /> i <br /> CASING INFO: 8-5/8" 24# J-55 csg. from surface to 627 ' <br /> 5-1/2" 15 .50#, K-55 LT&C csg. from surface to <br /> 4900' cemented with 150 sx (TOC @ 41751 ) <br /> PACKER/TUBING: No packer <br /> 2-3/8" 4 .7# J-55 8rd EUE tubing to 4587 ' <br /> EXISTING PERFORATIONS : 4670' - 4678' DIL (open) <br /> BOTTOM HOLE PRESSURE DATA: + 1300 psi (current zone) <br /> _PROPOSED PERFORATIONS : Return to production in current zone with <br /> additional perforations 46781- 4682 ' DIL <br /> Note: existing perforations 46761- 4678' <br /> DIL to be re-shot <br /> i <br /> PRODUCING FORMATION: Mokelumne (current & proposed perfs) <br /> WORKOVER PROGNOSIS <br /> i <br />{ <br /> 1 . R/U Halliburton wireline and test wireline lubricator. RIH <br /> I with six (6 ) foot 1-11/16" Deep Star thru tubing perforating <br /> gun, configured @ 6 shots/ft & Tri-Phase phasing. Put gun on <br /> depth and perforate well from 46761- 4682 ' DIL. POOH and R/D <br /> Halliburton wireline. <br /> I <br /> 2 . Return well to production, initially restricting flow rate to <br /> ± 250 mcf/day. <br /> 1 <br /> I <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.