Laserfiche WebLink
RESOURCES AGENCY OF CALIFORNIA <br /> DEPARTMENT OF CONSERVATION <br /> DIVISION OF OIL,GAS,AND GEOTHERMAL RESOURCES No.P 601-084 <br /> PERMIT TO CONDUCT WELL OPERATIONS 351 <br /> (field code) <br /> 00 <br /> (area code) <br /> 00 <br /> (new pool code) <br /> Mr. Robert D. Eberts, Agent 00 <br /> SIERRA RESOURCES, INC. (old pool code) <br /> P.O. Box 2788 <br /> Mammoth Lakes, CA 93546-2788 Sacramento, California <br /> February 27, 2001 <br /> Your proposal to Rework well "Piacentine" 1-27 <br /> A.P.I.No. 077-20484 ,Section 27 T. 3N R. 5E M.D. B.&M. <br /> King Island Gas field, any area Mokelumne pool <br /> San Joaquin County,dated 02/16/2001 received 02/26/2001 has been examined in conjunction with records <br /> filed in this office. <br /> THE PROPOSAL IS APPROVED PROVIDED THAT: <br /> 1. Blowout prevention equipment conforming to Class "II" B 3M requirements is installed on the 5-1/2" casing and <br /> maintained in operating condition at all times. See Manual M07. <br /> 2. Wire line operations are conducted through at least a 3M lubricator. <br /> 3. The Division is furnished copies of any draw down or back pressure tests performed. In addition, the Division will <br /> monitor the production for a period of six months and if anomalous water production is indicated, remedial action will <br /> be ordered. <br /> 4. THIS DIVISION IS NOTIFIED: <br /> a. In the event there are any blowouts, fires, serious accidents, or any significant gas or water leaks, they shall be <br /> promptly reported to this district office. <br /> b. Before deviating from the proposed casing programs and/or placing any plugs in the hole. Additional <br /> requirements shall be outlined at that time. <br /> c. To inspect the installed blowout prevention equipment prior to commencing operations. <br /> Blanket Bond <br /> BW/jc <br /> Enc(2) WILLIAM F.GUE�R/ARD,JR.,J�State Oil anGass Supervisor <br /> Engineer Bill Winkler By 6CC/. �✓��-� (t <br /> Phone(916) 322-1110 Robert A.Reid,Deputy Supervisor <br /> A copy of this permit and the proposal must be posted at the well site prior to commencing operations. <br /> Records for work done under this permit are due within 60 days after the work has been completed or the operations have been suspended. <br /> OG111 (6/96/GSR/5M) <br />