Laserfiche WebLink
uIv. of Oil & Gas - Dist. 6 <br /> &WO <br /> FED 2 6 tool <br /> Sacramento, California <br /> PIACENTINE #1-27 WELL <br /> REVISED WORKOVER PROGRAM <br /> FEBRUARY 16, 2001 <br /> WELL INFORMATION <br /> API No: 04-077-20484 FIELD: King Island <br /> ELEVATION: All measurements from KB (13' above GL) <br /> (KB-THF = 11 .51 ) <br /> TD: 4900' PBTD: 4715 ' (bridge plug) <br /> CASING INFO: 8-5/8" 24# J-55 csg. from surface to 627 ' <br /> 5-1/2" 15 . 50#1 K-55 LT&C csg. from surface to <br /> 4900' cemented with 150 sx (TOC @ 41751 ) <br /> PACKER TUBING: No packer <br /> 2-3/8" 4 . 7# J-55 8rd EUE tubing to 4650' <br /> EXISTING PERFORATIONS : 46841- 4690' & 47001- 4705 ' DIL (open) <br /> OTTOM HOLE PRESSURE DATA: ± 1100 psi (current zone) <br /> PROPOSED PERFORATIONS : Return to production in current zone <br /> (46841- 4690 ' upper perfs only) <br /> PRODUCING FORMATION: Mokelumne (current & proposed perfs) <br /> WORKOVER PROGNOSIS <br /> 1 . MIRU rig. R/U on tree. Circulate well with lease water and <br /> kill same. N/D tree and N/U BOP's. Note: Send in tree to <br /> Cameron's Woodland shop to service same. <br /> 2 . POOH slowly, keeping hole full and stand back tubing. <br />