My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS UIC PERMIT APP
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0528038
>
ARCHIVED REPORTS UIC PERMIT APP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 9:59:35 AM
Creation date
9/26/2019 9:22:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
UIC PERMIT APP
RECORD_ID
PR0528038
PE
2950
FACILITY_ID
FA0018998
FACILITY_NAME
NCPA LODI ENERGY CENTER
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1019
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WtAUCOVER RECOMMENDATIbN <br /> WELL NAME: PIACENTINE N% 1-27 AFE NO: $2008 <br /> DATE: _ August 11, 1992 PRIORITY: <br /> DISTRICTI Western FIELD: King Island <br /> ELEVATION: 11.5'M-THF TDt 4900' PBTDt 4730' <br /> CASING SIZE & SETTING DEPTIlt 5-1/2" 15.50L.K-55. IST&C cemgnted with <br /> 150 sx TOC 0) 4175' <br /> PROPOSED PERFSt 4701'-12' UN 4-SPF <br /> PRODUCING FORMA'T'ION: Mokelumne (Perfs 4721'-24') <br /> BOTWAI MOLE PRESSURE DATAt :t 2050I1si(estGnutgd) <br /> PACKER/ANCHOR: Baker"R-3" ncker 0 461.1' , <br /> TUBING SIZE&DEPTH: 2-7/8", 6„5#. ]•55, F13E. 8rd Ot-4611' <br /> PUMP: N/A <br /> RODSt Nom/ <br /> WELL HEAD: 11” 3M X 7-1/16" 3M <br /> LAST PRODUCTION TESTI BOPD MCFPD " CHORE <br /> REASON FOR WORI(OVERt Recomplete 19 shallower zone wltlilU the Mokelumne <br /> Sg id, Presentnt ry j Qenleting, <br /> PREPARED BY: T.M. Stone RESERVOIR DEPT.: <br /> PRODUCTION DEPT,t APPROVED BYt <br /> WORKOVER PROCEI)URE <br /> 1. MIRU rig. R/U on tree. PI well with 9,4 ppg brine water and kill well. Fill tubing <br /> annulus as required. N/D tree, N/U BOP'S, <br /> 2. Release packer. Circulate out. 11001I slow--keep hole full. <br /> 3. R/U wireline, Make gauge ring-Junk basket run to th 4720'. Set wireline CIBP at <br /> 4715'. POOH with wireline. 'Test casing to ]000 psi. <br /> 4. 01II with production setting as before.Set production packer at t 4600'.Test packer <br /> to 1000 psi on casing. <br /> 5, N/D BOP's. NIU and test tree. Swab fluid down to 2000'. R/IJ and test lubricator. <br /> GIII with 1-11/16" thru tubing perforating gun. Perforate 4701'-12'DN 4-SPF. <br /> 6. Unload and test well as needed. Obtaht gas sample. Release rig, <br />
The URL can be used to link to this page
Your browser does not support the video tag.