Laserfiche WebLink
WtAUCOVER RECOMMENDATIbN <br /> WELL NAME: PIACENTINE N% 1-27 AFE NO: $2008 <br /> DATE: _ August 11, 1992 PRIORITY: <br /> DISTRICTI Western FIELD: King Island <br /> ELEVATION: 11.5'M-THF TDt 4900' PBTDt 4730' <br /> CASING SIZE & SETTING DEPTIlt 5-1/2" 15.50L.K-55. IST&C cemgnted with <br /> 150 sx TOC 0) 4175' <br /> PROPOSED PERFSt 4701'-12' UN 4-SPF <br /> PRODUCING FORMA'T'ION: Mokelumne (Perfs 4721'-24') <br /> BOTWAI MOLE PRESSURE DATAt :t 2050I1si(estGnutgd) <br /> PACKER/ANCHOR: Baker"R-3" ncker 0 461.1' , <br /> TUBING SIZE&DEPTH: 2-7/8", 6„5#. ]•55, F13E. 8rd Ot-4611' <br /> PUMP: N/A <br /> RODSt Nom/ <br /> WELL HEAD: 11” 3M X 7-1/16" 3M <br /> LAST PRODUCTION TESTI BOPD MCFPD " CHORE <br /> REASON FOR WORI(OVERt Recomplete 19 shallower zone wltlilU the Mokelumne <br /> Sg id, Presentnt ry j Qenleting, <br /> PREPARED BY: T.M. Stone RESERVOIR DEPT.: <br /> PRODUCTION DEPT,t APPROVED BYt <br /> WORKOVER PROCEI)URE <br /> 1. MIRU rig. R/U on tree. PI well with 9,4 ppg brine water and kill well. Fill tubing <br /> annulus as required. N/D tree, N/U BOP'S, <br /> 2. Release packer. Circulate out. 11001I slow--keep hole full. <br /> 3. R/U wireline, Make gauge ring-Junk basket run to th 4720'. Set wireline CIBP at <br /> 4715'. POOH with wireline. 'Test casing to ]000 psi. <br /> 4. 01II with production setting as before.Set production packer at t 4600'.Test packer <br /> to 1000 psi on casing. <br /> 5, N/D BOP's. NIU and test tree. Swab fluid down to 2000'. R/IJ and test lubricator. <br /> GIII with 1-11/16" thru tubing perforating gun. Perforate 4701'-12'DN 4-SPF. <br /> 6. Unload and test well as needed. Obtaht gas sample. Release rig, <br />