My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS UIC PERMIT APP
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0528038
>
ARCHIVED REPORTS UIC PERMIT APP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 9:59:35 AM
Creation date
9/26/2019 9:22:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
UIC PERMIT APP
RECORD_ID
PR0528038
PE
2950
FACILITY_ID
FA0018998
FACILITY_NAME
NCPA LODI ENERGY CENTER
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1019
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WELLHEAD EQUIPMENT: Casing Head: Surface sales 8 5/8" OD SW x <br /> 11" 3M casing head with 2" 125 psi ball <br /> valve and no VR plug/nipple. Located at <br /> Surface Sales , Isleton, California - <br /> ( 916) 777-5133 . Starter head will be <br /> rented and purchased if well is productive. <br /> DRILLING PROCEDURE: 1 . Perform rig inspection, and make <br /> corrections as needed, prior to spud. <br /> Drill and survey 12 1/4" hole to <br /> +/-6001 . Make conditioning trip to <br /> surface . Circulate hole clean prior to <br /> pulling out of hole. <br /> 2 . RU casing crew and run 8 5/8" casing to <br /> +/-600 ' KB. Circulate and condition <br /> mud prior to cementing. <br /> 3 . Cement casing as specified in cement <br /> program. Reciprocate pipe +/-15 ' while <br /> cementing until cement returns ob- <br /> served, or until pipe starts to drag. <br /> DO NOT reciprocate pipe where casing <br /> collar could stop in head if casing <br /> stuck off bottom. Should float fail to <br /> hold, pressure back up to final pump <br /> pressure and hold. Use Class G Neat <br /> plus 3% CaC12 or pea gravel if cement <br /> falls in annulus. <br /> 4 . Wait on cement 4 hours . Install casing <br /> head. Test welds to 50% of casing <br /> collapse. Install BOPE and Flo-Sho <br /> equipment. Have Flo-Sho operational <br /> prior to drilling below surface casing. <br /> Test all BOPE to W.P. rating except <br /> annular. Test annular to 75% of rated <br /> W.P. Test casing to 1000 psi (minimum) . <br /> Notify D.O.G. of BOPE test prior to <br /> testing. <br /> 5. Wear bushing not needed. <br /> 6 . Rig up mudlogger at 25001 . <br /> 7. Drill 7 7/8" hole to total depth. <br /> -3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.