Laserfiche WebLink
TABLES <br /> Page <br /> 4.1 Cleanout and Production by Nitrogen Lift . . . . . . . . . . . . . . . . . . . . . 8-9 <br /> 5.1 Chemical Measurements During Flow . . . . . . . . . . . . . . . . . . . . . . . . 10 <br /> 5.2 Sample Methods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 <br /> 5.3 Analytical Methods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 <br /> 5.4 Chemical Analyses - Domengine Formation Water . . . . . . . . . . . . . . . . 14 <br /> 10.1 Summary of Confining Layer Leakoff Test Data . . . . . . . . . . . . . . . . . 33 <br /> A-1 Shut-In Temperature Log Data, 5/12/93 <br /> A-2 Shut-In Temperature Log Data, 6/8/93 <br /> D-1 Injection Test Pressure and Rate History <br /> E-1 Leakoff Test Pressure Data <br /> FIGURES <br /> 3.1 Casing Diagram - After Perforating . . . . . . . . . . . . . . . . . . . . . . . . . . 4 <br /> 3.2 Shut-In Temperature Log - 5/12/93, Before Perforating . . . . . . . . . . . . . . 6 <br /> 7.1 Casing Diagram - After Installation of Gravel Packed Liner . . . . . . . . . . 16 <br /> 8.1 Shut-In Temperature Log - 6/8/93, After Circulation and Gravel Pack . . . . 19 <br /> 8.2 Injection Rate and Measured Pressure at 4,000 Feet . . . . . . . . . . . . . . . 24 <br /> 8.3 Horner Plot for Injection Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25 <br /> 8.4 Pressure Difference versus Injection Rate . . . . . . . . . . . . . . . . . . . . . . 27 <br /> 9.1 Well Diagram - After Installation of Injection Tubing and Packer . . . . . . . 29 <br /> 9.2 Injection Pressure versus Rate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30 <br /> Mesquite Group, Inc. -ii <br />