Laserfiche WebLink
Horner Analysis <br /> slope=m=55 Psig <br /> log cycle <br /> kh=162.6 011 <br /> m <br /> kh=(162.6)(43255)(1.0)(0.98)=12517 md. t <br /> Assume h=230 feet b k=54.4 and <br /> s=1.1513 Plhr-P°i-°-log k )+3.2275 <br /> m �µctrw <br /> s=1.1513 1829-2098-104 54.4 +3.2275 <br /> (-55) (0.29)(0.98)(7.5E-06)(0.5)2 <br /> S=0.11 <br />