Laserfiche WebLink
Aor-28-97 06:20P Mesquite Group, Inc_ 714 525 2852 P_05 <br /> s Ftgl�rE 1 <br /> Well Diagram <br /> NCP Lodi STIG 4fl In jectton Well <br /> `lune 9. 1993, FLncl Completion <br /> 10 3/4" 40.5 lb/f=t <br /> K-55 ST&C Cosing <br /> 77 ,jts 4 1/2' 10.5 lb/FF. —611 FE <br /> J-55 casing as tubing Castng She <br /> F.- 20 IL)/FL <br /> K-55 ST&C <br /> Casing <br /> Bcnker Model AL-2 <br /> Large Bore Lok-Se F, <br /> Retr-rev3b-le-Pio{-cer�3342—F-'F — <br /> Per-For-=t-ions: (Tubing Memsur-ement) �3�,58 FL <br /> Tr--p of Luer Hanger <br /> 4 jet shots/FL. 0.317Ln. holes. 3660 FE <br /> Casing Shoe. 5- 15 lb/FE <br /> K-55 ST&C <br /> 1200 phasing Liner (cemented) <br /> 4155 Ft <br /> 4.234 - 4.239 Top of Packer <br /> 4.244 - 4.254 2 3/8_x2 15/16-OD <br /> 4.257 - 4.266 ' Hire wrapped <br /> 4.296 - 4.306 ::i <br /> 4.312 - 4.326 ::� �:: screen Iiner <br /> gravel ppac <br /> 4,331 - 4,379 F�ed <br /> 4,350 - 4.411 i <br /> tnside F Iiner <br /> 4.432 - 4.507 456 r F L Amu- S�r,d Fill <br /> 4.526 - 4.538 : BoLtom of screen <br /> 4,565 - 4.573 Liner Assembly 14599 FE <br /> Top of Float Collor <br /> Tocol neb perforated tnt.erval = 222 Ft 4645 Ft <br /> Liner Shoe <br /> Depths are based on HLS open hole logs doted 5/2/93 and 5/7/93. <br /> except. as noEed. <br /> 28 <br />