Laserfiche WebLink
Comments: <br /> Routine waste tire inspection was done on this date and the following was noted: <br /> No violations or areas of concern. <br /> Notes: <br /> 1.)TPID certificate is posted in the office. <br /> 2.) Permission to conduct inspection was granted by Dan Sigman (Maintenance). <br /> 3.) Facility plans to close in the near future. <br /> 4.) No EDT or CTL activities on WTMS. <br /> 5.) Facility was given the waste tire receipt and removal recordkeeping sheet. Instructed facility to keep track of <br /> waste tires removed after service. <br /> 5.) Retain all waste tire receipts, logs and manifests for 3 years. <br /> 6.) Generally, facility does not store its waste tires on site. "East Bay Tire" removes the waste tires after on site <br /> service is complete. <br /> 7.) Inspection report emailed to danny.sigman@ferguson.com. <br />