Laserfiche WebLink
Mr. Atwater Page 3 March 22 , 1989 <br /> I <br /> Phase 1 <br /> SITE EXCAVATION <br /> Engineering & Const. Mgmt. $ 1000 . 00 <br /> Labor 400.00 <br /> Excavate 225 cy contaminated soil 700 . 00 <br /> Backfill 2500 .00 <br /> Sampling (8 soil Samples @ $250) 2000 .00 <br /> Permits 500 . 00 <br /> Subtotal $ 7100 . 00 <br /> ONSITE TREATMENT & MONITORING j <br /> Aerate soil (6-8 weeks) $ 2000. 00 <br /> Sampling ( 4 Soil Samples @ $250) 1000.00 <br /> Subtotal $ 3000 . 00 <br /> Phase 2 <br /> MONITORING WELL CONSTRUCTION <br /> Engineering and Project Mgmt. $ 1000 . 00 <br /> Well Construction (4-inch diameter) 2500 . 00 <br /> Sample Analysis ( 1 water sample) 300 .00 <br /> Report Preparation 1200.00 <br /> Subtotal $ 5000 . 00 <br /> Total Estimated Cost $15100.00 <br /> These costs are estimates based on the best available information and <br /> our experience at similar sites. <br />