Laserfiche WebLink
i`at* nez Construction Memo -2- 17 March 1989 <br /> 10. Purging should be considered complete when pH, specific <br /> conductance, and temperature (or 2 of 3) stabilize. <br /> 11. If the results from sampling indicate that ground water is not <br /> contaminated, an additional round of samples must be collected <br /> for confirmation. <br />