Laserfiche WebLink
• <br /> • <br /> The well will be swabbed 30 times at a slow speed over the entire length of the well screen <br /> • followed by pumping of the well until the pump discharge water clears. This step will then <br /> be repeated with the swabbing speed increased. Following clearing of the discharge water <br /> from the final pumping, the well will be pumped at the submersible pump's maximum <br /> pumping rate (approximately 20 gallons per minute) for one hour. <br /> • <br /> After installation and development of the monitoring wells, the areal location of the well <br /> will be surveyed to produce an accurate plot plan. The casing elevations of the monitoring <br /> well will also be surveyed in order to obtain accurate groundwater elevations. A total <br /> • station surveying unit will be used to obtain the angle, distance, and elevation <br /> measurements. <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • <br />