Laserfiche WebLink
" -. <br /> i <br /> r <br /> ,.. Engineers <br /> EIRM <br /> a- --WE <br /> Pranners <br /> a Economists <br /> AEON Sciennsts <br /> CASE NARRATIVE <br /> Metals <br /> 29869 <br /> I. Holdi g-T.ime: <br /> All holding times were met. <br /> II. Analysis: <br /> A. Blanks: <br /> All acceptance criteria were met. <br /> B. Calibration: <br /> All acceptance criteria were met. <br /> C. TCP Interference Check Sample: <br /> All acceptance criteria were met• <br /> r= <br /> D. Spike Sample Analysis: <br /> All acceptance criteria were met. <br /> E. Duplicate Sample Analysis: <br /> All acceptance criteria were met. <br /> F. LabboiEatory Control Sam le Anal sis: <br /> All acceptance criteria were met. <br /> G. ICP Serial Dilution: <br /> Not required for this level QC. <br /> H• Other' <br /> None. <br /> III, I certify that this data package is in compliance with the <br /> terms and conditions agreed to by the client and CH2M HILL, <br /> both technically and for completeness, for other than the <br /> -, conditions detailed above. <br /> ��^�� <br /> Date: (n [ 4J31 <br /> Signed: � <br /> Fred Bickell <br /> cations supervisor <br /> 0Gu001 <br /> "- 996.266.5227 <br /> CH210 HILL Redding EnvironmenteW Laboratory.5090 Coterpil9ar Roac,Redding,Coritornio 96003 <br />