My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012596
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MINER
>
2716
>
2900 - Site Mitigation Program
>
PR0506119
>
ARCHIVED REPORTS XR0012596
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2019 3:33:24 PM
Creation date
10/2/2019 3:14:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012596
RECORD_ID
PR0506119
PE
2950
FACILITY_ID
FA0007211
FACILITY_NAME
DEL MONTE FOODS
STREET_NUMBER
2716
STREET_NAME
MINER
STREET_TYPE
AVE
City
STOCKTON
Zip
95213
APN
14344002
CURRENT_STATUS
01
SITE_LOCATION
2716 MINER AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
450
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
fi <br /> 4.3.2 FIELD MEASUREMENTS <br /> Elecirical conductivity, temperature, and pH measurements will be made during the <br /> collection of each groundwater sample. A pH meter with a combination gel-filled <br /> electrode or equivalent will be used for field pH determinations. A combination <br /> electrical conductivity-temperature-salinity meter or equivalent measuring device will be <br /> used to determine the conductivity and temperature. All instruments will be calibrated <br /> daily during field activities to maintain accuracy. <br /> The measurements will be made as follows: <br /> • The cell or container used to collect the purge water obtained during well <br /> sampling will be rinsed with sample water before filling. <br /> • Probes will be thoroughly rinsed with distilled water before measurement, <br /> then submerged in the flow-through cell and measurements taken. <br /> • All field measurements will be recorded in the field data sheet notebook <br /> along with the sample location, time, and date of measurement. <br /> After measurements are made, the probes will be decontaminated by <br /> rinsing with distilled water. <br /> HNu readings will be taken during field activities as described in the Site Safety Plan <br /> (Appendix A). In addition, the HNu will be used to monitor vapors from the drill <br /> cuttings and soil samples. HNu readings will be recorded in the drilling log. <br /> 4.33 EQUIPMENT DECONTAMINATION <br /> Near the drilling locations, an area will be established for equipment decontamination. <br /> Personnel decontamination is addressed in the Site Safety Plan (Appendix A). <br /> The auger and rear portion of the drill rig will be steam-cleaned before drilling each <br /> soil boring. The entire drill rig will be steam-cleaned before it leaves the drill site, if <br /> requested by the field hydrologist. Weli casing and screens will be steam-cleaned <br /> before they are placed in the wells or will arrive on site already cleaned and wrapped. <br /> All soil and water sampling equipment will be cleaned prior to use, between use, and <br /> before it leaves the site. Cleaning will consist of a deterget,, wash followed by rinses <br /> with water, isopropanol, and deionized water. Decontamination wastewater will be <br /> contained and disposed of as described in Section 3.5.2. Equipment will be air-dried. <br /> SF0316051WPWW.51 4-7 <br /> -„p3 _ I <br />
The URL can be used to link to this page
Your browser does not support the video tag.