Laserfiche WebLink
N - <br /> FIGURE B-1 <br /> PROPWI:D PROJECT SCHEDULE FOR EAST MINER TANK LOCATION <br /> (Schedui:begins upon San Joaquin County PHS approval of wort tiara.) <br /> WEEKS AFTER PHS APPROVES WORKPLAN <br /> TASK 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 31 <br /> Field Work Preparation <br /> Geophysical Investigation <br /> Soil-Gas Survey <br /> Soil Boring Sampling <br /> Lab Analyses of Soil Samples <br /> F <br /> Groundwater Well Installation <br /> 1 <br /> ,,Lab Analyses of Water Samples s <br /> D F <br /> Report&Recommendadons <br /> LEGEND <br /> IS CH2M HILL <br /> Ej Dei Monte <br /> D Draft i <br /> i <br /> F Final <br />