Laserfiche WebLink
+r s r <br /> 23 February 2000 <br /> AGE-NC Project No 98-0533 <br /> Page 8 of 8 <br /> 4 5 EQUIPMENT DECONTAMINATION <br /> All sampling tools used for sample collection will be thoroughly nnsed with clean water after being <br /> washed with a solution of Alconox All down-hole drilling and sampling equipment will be pressure <br /> washed prior to starting the boring <br /> Advanced GeoEnvironmental,Inc <br />