Laserfiche WebLink
J. H. KLEINFELDER & ASSOCI•ES • <br /> . ' 2 BACKGROUND <br /> The 0/LDC facility is located at 1220 E. Victor Road, Lodi, California, <br /> ' (see Plate 1) . The facility is owned by the Dallas Corporation and is <br /> operated as a galvanized steel door manufacturing plant. Historically, <br /> various plant waste materials have been discharged to an onsite SI which <br /> has acted as a settling basin and evaporation pond. <br /> ' Closure of the SI is scheduled for the fall of 1987. A closure plan was <br /> submitted to the DOHS in December 1986. This work plan presents <br /> information designed to supplement the closure plan. Data obtained during <br /> this study will be used to determine site specific clean up levels. these <br /> clean up levels will be used to verify clean closure of the SI in lieu of <br /> the methodology proposed in the closure plan. <br /> Soil samples will be obtained from three onsite soil borings. The soil <br /> ' boring locations were selected by DOHS and RWQCB personnel and are <br /> positioned in areas far removed from potential affects of the SI (see <br /> ' Plate 2) . Selected soil samples will be assessed for various chemical and <br /> physical characteristics. The findings of this study will be utilized <br /> ' during SI closure and development of the Hydrogeology Assessment Report <br /> (HAR). <br /> 51-87-413 2 <br />