Laserfiche WebLink
MONITORING WELL LOG <br /> PROJECT NAME: Stockton Metro Air ort ILOG OF MONITORING WELL BORING: MVV-7 <br /> v <br /> J � <br /> LL a w � UO] 2 a) <br /> X E _j w U) E DESCRIPTION V LL <br /> e n (L m Z) >- C <br /> IL m o p Q j a <br /> o 0 m a vl Z v w <br /> 50 POORLY GRADED SAND: Brown,moist,dense,medium grained. 50 <br /> Heaving sands <br /> SP <br /> 2s <br /> 55 <br /> 55 <br /> 0.7 MW-7-60 <br /> 60 <br /> 60 <br /> Terminated soil boring at 60 feet below ground surface(bgs). <br /> Installed 2-inch diameter,schedule 40 PVC well screen and casing. <br /> 65 0 02-inch factory slotted screen interval at 40 to 60 feet bus. 65 <br /> 03 sand filter pack at 38 to 60 feel bgs. <br /> Hydrated bontonito seal at 35 to 38 fort 6gn — <br /> NCat"mm grout Sial At 1 to 35 leet hg% <br /> Well head wrnpleted with 12-inch dlarnotor flush mounted traffic rotes wen box in rnnere tc <br /> 70 70 <br /> 75 75 <br /> 80 80 <br /> Page 2 of 2 <br />