My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE HISTORY
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LARCH
>
503
>
2900 - Site Mitigation Program
>
PR0504770
>
SITE HISTORY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2019 4:54:59 PM
Creation date
10/4/2019 4:49:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE HISTORY
RECORD_ID
PR0504770
PE
2950
FACILITY_ID
FA0006319
FACILITY_NAME
HFCC
STREET_NUMBER
503
Direction
W
STREET_NAME
LARCH
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21220005
CURRENT_STATUS
02
SITE_LOCATION
503 W LARCH RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i! <br /> VFCrh%, @irN.. SACRAMENTO' <br /> Types of bodies of water bordering the site, ;if any: <br /> Stream River Pond Lake Bay <br /> Ocean Other None _X__ <br /> Are the services being provided as a consequence of orders from"local, state, or <br /> federal officials? <br /> Yes No X <br /> 1.3 Purpose <br /> The primary purpose of the site safety plan'is to provide Versar, Inc.:field <br /> personnel and subcontractors with an understanding of the potential'..chemical and <br /> physical hazards that exist or may arise while the tasks of this project are being <br /> I. <br /> performed. Secondarily, the information contained herein will define the safety <br /> l precautions necessary to respond to such hazards should they occur. <br /> �E <br /> 1.4 Objective <br /> The primary objective is to ensure the well-being of all field personnel and the <br /> community surrounding the site. In order to' accomplish this, project'stotaff and approved <br /> subcontractors shall acknowledge and adhere to the policies and procedures!'established <br /> L <br /> herein. Accordingly, all personnel assigned to this project shall read this site safety plan <br /> and sign the Agreement Statement in Section 8.1 to certify that they have read, <br /> understood, and agreed to abide by its provisions. <br /> 1.5 Hazard Determination <br /> Serious Moderate Low X. Unknown <br /> 1.6 Level of Protection <br /> X Modified level' D <br /> . 2 <br /> E <br /> E <br /> I'' <br />
The URL can be used to link to this page
Your browser does not support the video tag.