My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE HISTORY
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LARCH
>
503
>
2900 - Site Mitigation Program
>
PR0504770
>
SITE HISTORY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2019 4:54:59 PM
Creation date
10/4/2019 4:49:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE HISTORY
RECORD_ID
PR0504770
PE
2950
FACILITY_ID
FA0006319
FACILITY_NAME
HFCC
STREET_NUMBER
503
Direction
W
STREET_NAME
LARCH
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21220005
CURRENT_STATUS
02
SITE_LOCATION
503 W LARCH RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
■FC l,, irNIC SACRAMENTO, <br /> W <br /> - dismissing field personnel from°the site if their actions or.'negligence <br /> endangers themselves, co-workers, or;the public and reporting the same to <br /> the Project Manager and/or Health and Safety Manager within'24 hours <br /> ' <br /> - reporting accidents or violations' of th.e site safety plan to the Project <br /> Manager and/or Health and Safety Manager within 24 hours <br /> - knowing emergency procedures,- evacuation routes, and.:the' telephone <br /> numbers of the ambulance, local hospital; poison control center; fire and <br /> police departments <br /> ensuring that all project-related, personnel have signed the personnel <br /> agreement and acknowledgemets form contained in this site'safety plan <br /> coordinating upgrading and downgrading of PPE with the Health and <br /> Safety Manager, as necessary, due to changes in exposure levels, <br /> monitoring results, weather, and other site conditions <br /> ` - performing air monitoring with;approved instruments in accordance with <br /> requirements stated in this Site,,Safety Plan. r <br /> 2.4 Field Team Leader: Vernon Elarth " <br /> In the event that the Project Manager and the Site Safety Officer are not on the <br /> site, the Field Team Leader will assume all responsibility for enforcing safety procedures. <br /> 2.5 Field Personnel <br /> F All field personnel shall be responsible for acting in compliance-with all safety <br /> procedures outlined in this site safety plan. Any hazardous work situations or procedures <br /> should be reported to the Site Safety officer so that corrective steps can be°taken. The <br /> Health and Safety Manager and/or Site Safety Officer has the authority to halt any <br /> operation that does not follow the provisions of this Site Safety Plan. <br /> L b <br /> 4 s ' <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.