Laserfiche WebLink
■FC l,, irNIC SACRAMENTO, <br /> W <br /> - dismissing field personnel from°the site if their actions or.'negligence <br /> endangers themselves, co-workers, or;the public and reporting the same to <br /> the Project Manager and/or Health and Safety Manager within'24 hours <br /> ' <br /> - reporting accidents or violations' of th.e site safety plan to the Project <br /> Manager and/or Health and Safety Manager within 24 hours <br /> - knowing emergency procedures,- evacuation routes, and.:the' telephone <br /> numbers of the ambulance, local hospital; poison control center; fire and <br /> police departments <br /> ensuring that all project-related, personnel have signed the personnel <br /> agreement and acknowledgemets form contained in this site'safety plan <br /> coordinating upgrading and downgrading of PPE with the Health and <br /> Safety Manager, as necessary, due to changes in exposure levels, <br /> monitoring results, weather, and other site conditions <br /> ` - performing air monitoring with;approved instruments in accordance with <br /> requirements stated in this Site,,Safety Plan. r <br /> 2.4 Field Team Leader: Vernon Elarth " <br /> In the event that the Project Manager and the Site Safety Officer are not on the <br /> site, the Field Team Leader will assume all responsibility for enforcing safety procedures. <br /> 2.5 Field Personnel <br /> F All field personnel shall be responsible for acting in compliance-with all safety <br /> procedures outlined in this site safety plan. Any hazardous work situations or procedures <br /> should be reported to the Site Safety officer so that corrective steps can be°taken. The <br /> Health and Safety Manager and/or Site Safety Officer has the authority to halt any <br /> operation that does not follow the provisions of this Site Safety Plan. <br /> L b <br /> 4 s ' <br /> i <br />