My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2185
>
3500 - Local Oversight Program
>
PR0544922
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2019 3:16:59 PM
Creation date
10/7/2019 3:05:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544922
PE
3528
FACILITY_ID
FA0003284
FACILITY_NAME
FOOD MART GASOLINE*
STREET_NUMBER
2185
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14113045
CURRENT_STATUS
02
SITE_LOCATION
2185 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ultramar _ <br /> Ultramar,Inc. lecopy: 209 565 5685 Credit <br /> P.O.Box 466 l 209 583 3330 Administrative <br /> m � z � '6 209-583-33D2 Information Services <br /> 525 W.Third Street 209 563 3358 Accounting <br /> Hanford,GA 93232-0466 <br /> (209)582-0241 <br /> DATE REPORT SUBMITTED: July 1, 1996 JUL 8 19961 <br /> QUARTER ENDING: June 30, 1996 <br /> NTAL <br /> SERVICE STATION NO.: 494 EN PERMITISERVICESL1N <br /> ADDRESS: 2185 East Fremont, Stockton, California <br /> COUNTY: San Joaquin <br /> ULTRAMAR CONTACT: Kenneth R. Earnest TEL. NO: 209-583-5571 <br /> BACKGROUND: <br /> Due to a possible real estate divestment three ground-water monitoring wells and two <br /> soil borings were completed in April 1992. Initial laboratory results indicated that two <br /> of the monitoring wells exhibited detectable amounts of petroleum hydrocarbons. Both <br /> of the soil borings exhibited non-detectable amounts of petroleum hydrocarbons. <br /> The three 10,000 gallon underground storage tanks, product lines and dispensers were <br /> removed from the site on March 8, 1993, <br /> A Limited Soil Gas Survey and Vacuum Extraction Feasibility Test was completed in <br /> mid March 1993, with favorable results for future vapor extraction. <br /> Drilled site to confirm the completion of soil remediation in mid-June 1995. <br /> SUNIlVIARY OF THIS UARTER'S ACTIVITIES: <br /> Quarterly monitoring sampling was performed on May 30, 1996. <br /> RESULT OF QUARTERLY MONITORING: <br /> Groundwater analyses show that none of the monitoring wells contain detectable <br /> amounts of TPH as gasoline and benzene, except MW-2, which has 58 parts-per-billion <br /> (ppb) TPH as gasoline and MW-3 which has 0.93 ppb benzene. <br /> PROPOSED ACTIVITY OR WORK FOR NEXTQUARTER: <br /> ACTIVITY ESTIMATED COMPLETION DATE <br /> Third Quarter Monitoring August 1996 ??? <br /> Submit site for closure July 1996 <br /> BEACON <br /> A Member of the Ultramar Group of Companies #1 Quality and Service <br />
The URL can be used to link to this page
Your browser does not support the video tag.