Laserfiche WebLink
Ultramar <br /> Ultramar Inc Telecopy 209 584 6113 Credit&Wholesale <br /> P 0 Box 466 209 583 3330 Administrative <br /> 525 ray Third Street 209 583 3302 Information Services <br /> Hanford CA 93232 0466 209 583 3358 Accounting <br /> (209)582 0241 <br /> ENVIRONMENTAL PROJECT <br /> QUARTERLY STATUS REPORT R E C E <br /> I V E ou" <br /> DATE REPORT SUBMITTED: August 6, 1993 AU 8 10 14,43 <br /> QUARTER ENDING: June 30, 1993 €NvtRoNmtNfAL MR-kTh <br /> SERVICE STATION NO. : 494 PERMIT/lERVICES5 <br /> ADDRESS: 2185 East Fremont, Stockton, California <br /> COUNTY: San Joaquin <br /> ULTRAMAR CONTACT: Kenneth R Earnest TEL. NO: 209-583-5571 <br /> BACKGROUND: <br /> Due to a possible real estate divestment three ground-water <br /> monitoring wells and two soil borings were completed in April <br /> 1992 Initial laboratory results indicated that two of the <br /> monitoring wells exhibited detectable amounts of petroleum <br /> hydrocarbons. Both of the soil borings exhibited <br /> non-detectable amounts of petroleum hydrocarbons. <br /> The three 10,000 gallon underground storage tanks, product <br /> lines and dispensers were removed from the site on March 8, <br /> 1993. <br /> A Limited Soil Gas Survey and Vacuum Extraction Feasibility <br /> Test was completed in mid March 1993, with favorable results <br /> for future vapor extraction. <br /> SUMMARY OF THIS QUARTER'S ACTIVITIES: <br /> Quarterly monitoring was performed on April 15, 1993. <br /> Performed pump test and results are pending <br /> RESULT OF QUARTERLY MONITORING: <br /> Ground-water analyses show MW-3 and MW-4 to contain the <br /> largest amounts of benzene at 690 and 42 parts per billion <br /> respectively MW-1, MW-2 and MW-5 contain 13 , 6.9 and <13. <br /> parts per billion respectively. <br /> BEACON <br /> A Member of the Ultramar Group of Companies #1 Quality and Service <br />