Laserfiche WebLink
ACTON a MICI ELSON • van DAM, INC. <br /> SANTLINGIDEVELO)PMENT INFORMATION <br /> Project Name y�LA <br /> Sampling/Development Point t'^w E <br /> Sample 1 D Project No 1°1 00 S_ QS <br /> Describe Sampling/Development Point Work Order # <br /> Date L111 S 1 01 y <br /> Field Crew_ RC <br /> !r <br /> Well Depth 133 feet below MP Casing Diameter y inches <br /> Depth to Water (below MP) O• B feet <br /> Discharge Rate gpm Time 0"1 • 30 AM/PM <br /> Number of borehole volumes <br /> evacuated before sampling y <br /> Sampling/Development Method <br /> Tap Bailer Centnfugal Primp <br /> Submersible Other <br /> Pump intake or bailer set at feet below MP <br /> Sample Appearance 4-F piz <br /> Note any Sampling Problems <br /> Note any Equipment Washing <br /> Samples Collected/Ttme �-l'•�1 O Co�Sr'1G�6 <br /> EVACUATION/STABILIZATION TEST DATA <br /> Temperature Cumulative <br /> Corrected Water Level Volume of Water Pumping <br /> pH Conductance Temperature (nearest Removed from Well Rate <br /> Time (units) (umhoslcm) (°C) 0 01 foot) (gallons) (.-Pm) <br /> l3 55 "7•b to 1z . (00 -ISO) <br /> ��'• o -7 105 12 10 7G. 0 1(v <br /> t 'A Z15 ?.5b IZ . z -74 . 15 2 <br /> t � '• 3� -I. S2 1Z . 10 -11-1 • � 3Z <br /> Bailing Start Time <br /> Bailing Stop Time <br /> Comments <br /> Signature Date 05hy <br />