Laserfiche WebLink
SAN JOAQUIN COUNTY HAZARDOUS MATERIALS MANAGEMFNT PLAN Page 2 of 3 <br />SIGN <br />LOCATION OF HMMP FOR EMPLOYEE USE <br />(10) BREAK ROOM ON THE ANNOUNCEMENT BOARD <br />SURROUNDING OCCUPANCIES AND LAND USE SECTION (11) <br />The following types of neighbors (e.g. residential, commercial, open space) are located within 1/8th mile of our facility. <br />Names of hospitals, schools, and day-care centers within 1/8th mile of our facility are also shown. This information <br />should be provided to the 9-1-1 operator at the time of the initial notification. <br />NORTH ELEMENTRY SCHOOL ON EAST OPEN FIELD / INDUSTRIAL <br />ALPINE/SAN G UI N ETTI <br />SOUTH OPEN FIELD / INDUSTRIAL WEST INDUSTRIAL <br />SPILL CONTROL PROCEDURES SECTION <br />The following types of neighbors (e.g. residential, commercial, open space) are located within 1/8th <br />mile of our facility. Names of hospitals, schools, and day-care centers within 1/8th mile of our facility <br />are also shown. This information should be provided to the 9-1-1 operator at the time of the initial <br />notification. <br />PILL CONTROL LEADER (12) MIKE COVEY / TONY GARRETT <br />(also oversees inspections of areas or <br />systems vulnerable to earthquakes) <br />HE FOLLOWING INDIVIDUALS/POSITIONS ARE ASSIGNED TO HELP CONTROL A SPILL (13) <br />TONY GARRETf / SHOP MANAGER MIKE COVEY ]R. / YARD/EQUIPMENT MANAGER SHANNON COVEY / <br />SAFETY/CLAIMS/HR MANAGER <br />UTHORIZED SPILL CONTROL STRATEGIES (14) <br />his business has authorized the above personnel to perform the action(s) indicated below to control spills of <br />hazardous materials on its property. Persons performing these tasks will possess written procedures for performing <br />hem and will have received training on the procedures and equipment needed prior to carrying them out. Locations of <br />needed equipment are shown on the facility map. At a minimum our business must isolate the area of the spill and <br />make notifications. <br />SPILLS OF LIQUID MATERIALS <br />E Plug and Patch Container i- Build Retention Dike <br />❑ Remove Sources of Ignition ❑ Position Container so as to Stop Leak <br />❑ Reduce Pressure in Container/System Isolate Area and Make Notifications <br />❑ Neutralize Spilled Material ❑ Secure System Valves and Closures <br />F Shutdown System Involved 0 Apply Absorbent Material to Spill Area <br />❑ N/A <br />RELEASE OF COMPRESSED GASES SPILLS OF SOLID MATERIALS <br />G Shut Off Valves/Systems ❑° Cover Spill to Prevent Spread <br />❑� Ventilate Area of Release ❑ Neutralize Spilled Materials <br />Reduce Pressure in Container/System Position Container so as to Stop Leak <br />❑ Suppress Vapors with Water Place Spilled Material into Drum or Bag <br />❑� Isolate Area and Make Notifications 0 Isolate Area and Make Notifications <br />0 Remove Sources of Ignition ❑ N/A <br />http://sjoesdata.org/oes_hmmp/section_tables/HMMP_ps_Review.lasso?-Database=transa... 6/28/2010 <br />