Laserfiche WebLink
STI Aboveground Storage Tank Report Formal External Inspection COVEY AUTO EXPRESS,Stockton,CA <br /> Storage Tank Report 1/21/2014 Tank No.2_500 GA Horizontal Cylindrical Exterior Used Oil <br /> Ref: Inspection Goal Methods Employed <br /> Spool Results <br /> 9.2011 <br /> 7.1 GENERAL <br /> 7.1.1 Formal External CertificationNameandNumber Daniel K. Barber <br /> Inspection is to be <br /> performed by STI Certified <br /> certified inspector Level II AST SAC 18709 <br /> 7.1.2 Applicable Check List Horizontal and Vertical Cylindrical Single Wall,Steel See Below for each AST <br /> Horizontal Rectangular Double Wall,Steel Photos attached,Test w/ <br /> Containment&Accessories-Visual,Ultrasonic Thickness NOT Systems TGllaDL <br /> Testing(LITT),History. Ser.No 1105763 Callb.2013 <br /> 7.1.3 Review History Interview long time employees Inspection and Drain Release Discuss with MikeCovey,lr. <br /> Records. Truck Shop Management <br /> 7.1.4A Record AST Locate Plate,-Manufacturer,Date,Design Standard.Serial King Bros.Portland,OR est <br /> Nameplate Data No. 1990-2010, ULP794796 <br /> Capacity,shell thickness,diameter,length "500'GA, 12ga Horizontal <br /> Cylindrical 5.5'x 3.95'Dia. <br /> 7,1.48 Record Inspection Apply Visual,Ultrasonic&other methods,Photograph and OK <br /> Findings&Problems Record Findings. <br /> 7.1.5 Inspect Fabrication ComparetoLIL,SWI,STI or other industry standards, UL 142 Possiblesinglewall,no <br /> vs.indust Standards modifications to original AST. ULTag <br /> 7.1.6 Verify Foundation Visual examination for concrete cracking,spalling,washout, Sound but PCC Containment <br /> Integrity voids,settling,slope from AST,standing water,soil contact, floor with open joints <br /> seepage. <br /> 7.1.7 Visually Inspect Cracking or spalling,corrosion,anchorage,weld failure or OK <br /> Supports stress,saddle pads. <br /> 7,1,8 Visuallylnspect Visual examination for cracking,spalling,welds, Damaged Sand filled block wall, <br /> Secondary containment,penetrations,other containers,basis of open drain couple <br /> Containment,Spill volume calculations,drain valves closed&secured,debris Good personnel access No <br /> Control&CRDM Free,& personnel access. support,wood blocks 129 IN x <br /> Containment ID 161 IN x 33.51N <br /> 1-3/2 drain outlet open <br /> 7.1.9A Inspect Ancillary Inspect operability of pumps,valves and piping for stress, N/A <br /> Equipment-Pumps leakage,fusible links,for corrosion,wiring conduit integrity. <br /> Fill point containment,Camlock connectors <br /> 7.1,98 Inspect Ancillary Inspect operability of emergency relief&normal venting, Emergency Relief Venting: <br /> Equipment-Vents continuity of vapor containment. No ERV No normal vent relies on <br /> single topside fill opening <br /> 7.1.9C Inspection Ports Interstitial n/a Verify no leakage Into secondary Interstitial PVC plugs should be metal <br /> 7.1.9D Inspect Ancillary No level gauge Only one top port <br /> Equipment-Liquid <br /> Level <br /> 7.1.9E Inspect Alarms Overfill Alarm Only none on secondary interstitial volume No alarm <br /> 7.1.10 Inspect Bonding and Refer to NFPA 780 Standards for Installation of Lightning No grounding <br /> Grounding,If present Protection Systems. <br /> 7.1.11 inspect Stairways, Inspect for broken welds,bent members,corrosion,debris N/A <br /> Handrails&Platforms free. <br /> 7,1,12 Inspect Coatings& Exterior of shell,heads,supports and interference with OK,dent broad area lower l/4 <br /> Labels equipment,Signage. <br />