STI Aboveground Storage Tank Report Formal External Inspection COVEY AUTO EXPRESS,Stockton,CA
<br /> Storage Tank Report 1/21/2014 Tank No.2_500 GA Horizontal Cylindrical Exterior Used Oil
<br /> Ref: Inspection Goal Methods Employed
<br /> Spool Results
<br /> 9.2011
<br /> 7.1 GENERAL
<br /> 7.1.1 Formal External CertificationNameandNumber Daniel K. Barber
<br /> Inspection is to be
<br /> performed by STI Certified
<br /> certified inspector Level II AST SAC 18709
<br /> 7.1.2 Applicable Check List Horizontal and Vertical Cylindrical Single Wall,Steel See Below for each AST
<br /> Horizontal Rectangular Double Wall,Steel Photos attached,Test w/
<br /> Containment&Accessories-Visual,Ultrasonic Thickness NOT Systems TGllaDL
<br /> Testing(LITT),History. Ser.No 1105763 Callb.2013
<br /> 7.1.3 Review History Interview long time employees Inspection and Drain Release Discuss with MikeCovey,lr.
<br /> Records. Truck Shop Management
<br /> 7.1.4A Record AST Locate Plate,-Manufacturer,Date,Design Standard.Serial King Bros.Portland,OR est
<br /> Nameplate Data No. 1990-2010, ULP794796
<br /> Capacity,shell thickness,diameter,length "500'GA, 12ga Horizontal
<br /> Cylindrical 5.5'x 3.95'Dia.
<br /> 7,1.48 Record Inspection Apply Visual,Ultrasonic&other methods,Photograph and OK
<br /> Findings&Problems Record Findings.
<br /> 7.1.5 Inspect Fabrication ComparetoLIL,SWI,STI or other industry standards, UL 142 Possiblesinglewall,no
<br /> vs.indust Standards modifications to original AST. ULTag
<br /> 7.1.6 Verify Foundation Visual examination for concrete cracking,spalling,washout, Sound but PCC Containment
<br /> Integrity voids,settling,slope from AST,standing water,soil contact, floor with open joints
<br /> seepage.
<br /> 7.1.7 Visually Inspect Cracking or spalling,corrosion,anchorage,weld failure or OK
<br /> Supports stress,saddle pads.
<br /> 7,1,8 Visuallylnspect Visual examination for cracking,spalling,welds, Damaged Sand filled block wall,
<br /> Secondary containment,penetrations,other containers,basis of open drain couple
<br /> Containment,Spill volume calculations,drain valves closed&secured,debris Good personnel access No
<br /> Control&CRDM Free,& personnel access. support,wood blocks 129 IN x
<br /> Containment ID 161 IN x 33.51N
<br /> 1-3/2 drain outlet open
<br /> 7.1.9A Inspect Ancillary Inspect operability of pumps,valves and piping for stress, N/A
<br /> Equipment-Pumps leakage,fusible links,for corrosion,wiring conduit integrity.
<br /> Fill point containment,Camlock connectors
<br /> 7.1,98 Inspect Ancillary Inspect operability of emergency relief&normal venting, Emergency Relief Venting:
<br /> Equipment-Vents continuity of vapor containment. No ERV No normal vent relies on
<br /> single topside fill opening
<br /> 7.1.9C Inspection Ports Interstitial n/a Verify no leakage Into secondary Interstitial PVC plugs should be metal
<br /> 7.1.9D Inspect Ancillary No level gauge Only one top port
<br /> Equipment-Liquid
<br /> Level
<br /> 7.1.9E Inspect Alarms Overfill Alarm Only none on secondary interstitial volume No alarm
<br /> 7.1.10 Inspect Bonding and Refer to NFPA 780 Standards for Installation of Lightning No grounding
<br /> Grounding,If present Protection Systems.
<br /> 7.1.11 inspect Stairways, Inspect for broken welds,bent members,corrosion,debris N/A
<br /> Handrails&Platforms free.
<br /> 7,1,12 Inspect Coatings& Exterior of shell,heads,supports and interference with OK,dent broad area lower l/4
<br /> Labels equipment,Signage.
<br />
|