Laserfiche WebLink
STI Aboveground Storage Tank Report Formal External Inspection COVEY AUTO EXPRESS,Stockton,CA <br /> Storage Tank Report 1/21/2014 Tank No.3 275 GA UL80 Obround Exterior Red Paint-Used Oil <br /> Ref: Inspection Goal Methods Employed Results <br /> spool <br /> 9-2011 <br /> 7,1 GENERAL <br /> 7.1.1 Formal External Certification Name and Number Daniel K. Barber <br /> Inspection is to be STI Certified <br /> performed by Level II AST 8AC 18709 <br /> certified inspector <br /> 7.1.2 Applicable Check List Horizontal and Vertical Cylindrical Single Wall,Steel See Below for each AST <br /> Horizontal Rectangular Double Wall,Steel Photos attached,Test w/ <br /> Containment&Accessories-Visual,Ultrasonic Thickness NDT Systems TG310-DL <br /> Testing(UTTI,History. Ser.Ne 1105763 Celib.2013 <br /> 7.1.3 Review History Interview long time employees Inspection and Drain Release Discuss with Mike Covey,Jr. <br /> Records. Truck Shop Management <br /> 7.1.4A Record AST Locate Plate-Manufacturer,Date,Design standard.Serial -275-GA, 14ga Horizontal <br /> Nameplate Data No. Obround 2.2l'widex2.67'high <br /> Capacity,shell thickness,diameter,length x 5.0'long <br /> 7.1.48 Record Inspection Apply Visual,Ultrasonic&other methods,Photograph and DK <br /> Findings&Problems Record Findings. <br /> 7.1.5 Inspect Fabrication Compare to UL,SWI,STI or other industry standards, _&C80 Possible single wall,no UL <br /> vs.Industry Standards modifications to original AST. Tag <br /> 7.1.6 Verify Foundation Visual examination for concrete cracking,spalling,washout, Sound but PCC Containment <br /> Integrity voids,settling,slope from AST,standing water,soil contact, floor with open joints <br /> seepage. 1-1/21N pipe legs <br /> 7.1.7 Visually Inspect Cracking or spalling,corrosion,anchorage,weld failure or OK <br /> Supports stress,saddle pads. <br /> 7.1.8 Visually Inspect Visual examination for cracking,spalling,welds, Damaged sand filed block wall, <br /> Secondary containment,penetrations,other containers,basis of open drain couple <br /> Containment,Spill volume calculations,drain valves closed&secured,debris Good personnel access <br /> Control&CRDM free,& personnel access. <br /> Containment ID 1291N x 1611N x 33.51N <br /> 1-1/2 citain outlet open <br /> 7,1,9A Inspect Ancillary Inspect operability of pumps,valves and piping for stress, N/A <br /> Equipment-Pumps leakage,fusible links,for corrosion,wiring conduit Integrity. <br /> Fill point containment,Camlock connectors <br /> 7.1.98 Inspect Ancillary Inspect operability of emergency relief&normal venting, Emergency Relief Venting: <br /> Equipment-Vents continuity of vapor containment. No ERV No normal vent relies on <br /> single topside fill opening <br /> 7.1.9C Inspection Ports Interstitial n/a Verify no leakage Into secondary Interstitial PVC plug-should be metal <br /> 7.1.9D Inspect Ancillary No level gauge Only one top port <br /> Equipment-Liquid <br /> Level <br /> 7.1.9E Inspect Alarms Overfill Alarm Only none on secondary interstitial volume No alarm <br /> 7.1.10 Inspect Bonding and Refer to NFPA 780 Standards for Installation of Lightning No grounding <br /> Grounding,if present Protection Systems. <br /> 7.1.11 Inspect Stairways, Inspect for broken welds,bent members,corrosion,debris N/A <br /> Handrails&Platforms free. <br /> 7.1.12 Inspect Coatings& Exterior of shell,heads,supports and Interference with OK <br /> Labels equipment,Signage. <br />