Laserfiche WebLink
Monitoring System Certification RECEIVED <br /> UST Monitoring Site Plan NOV 3 0 2017 <br /> Site Address: FOOD MART GAS 2185 EAST FREMONT AVE NSTOCKTON CALIFORNIA 95205 <br /> . . . . . . . . . <br /> . . . . . <br /> n <br /> . . .DEPARTMENT. . . . <br /> . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> 87 . . . . . . . . . . . . . . . . <br /> 0 <br /> . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> � . . . . . . 1 . . . . . . . . . . . . . <br /> . 91. . .. .. .. . . .. .. .. . .. .. .. . .. .. .. .. <br /> 0 <br /> X . . . . . . � . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . <br /> KEY <br /> A=ANNULAR <br /> . . . . . . . F=FILLS <br /> . . . . . T=TURBINE <br /> DIE . . . . . . . . . . . . . . . . . . P=PROBE <br /> V=VAPOR <br /> X=SUMP SENSOR <br /> . . . . . . . . . . . . . . . =LD <br /> \ . . . . M=Manway <br /> B=Brine Sensor <br /> . . . . 1=Smart Sensor <br /> S=STP <br /> C=Floats&Chains <br /> . . . . . . . . . . . . . . . . . E—E Stop <br /> FREMONT STREET <br /> Date map was drawn:9-29-17 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,K installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2/21/07 <br />