My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2003 - 2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2185
>
2300 - Underground Storage Tank Program
>
PR0231118
>
COMPLIANCE INFO 2003 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 3:52:53 PM
Creation date
10/21/2019 3:25:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003 - 2008
RECORD_ID
PR0231118
PE
2371
FACILITY_ID
FA0003284
FACILITY_NAME
FOOD MART GASOLINE*
STREET_NUMBER
2185
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14113045
CURRENT_STATUS
01
SITE_LOCATION
2185 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING SYSTEM CERTI1 _11AT10 <br /> Use 41,.4/1 Jurisdictions II.7t/jin 1/7e Stu/e of Ccnrlornia <br /> .4whority Ciled: Chapler 6:7, Hecilth and Snfeo,Code; Chapter 16, Division 3, Title 23, Californ <br /> This form must be used to document testing and servicing of monitoring <br /> g g equipment. A separate certification or re or' must bh•• a <br /> prepared for each monitoring system control panel by the technician who performs the work. A copy of this form �j.� b rovided to <br /> the tank system owner/operator. <br /> The-owner/operator must submit a copy of this form to the local agency reglti til 1 57 � ms <br /> within 30 days of test d�6. �z <br /> A. General Information SAN JOAQUIN, <br /> FacilityName: 044A W, ).y+6W i2.' r ai► ENVIRONME y <br /> ,-n B Id�-l�7-�QEF, <br /> Site Address: Zliv i? Ci <br /> ty: S�-/J�•i'�f-Jn Zip: <br /> Facility Contact Person: Contact Phone No.: <br /> Make/Model of Monitoring System: Tt!C 3Sl) Date of Testing/Servicing: <br /> B. Inventory of Equipment Tested/Certified <br /> Check the a n o riate boxes to indicate specific equipment inspected/sen-iced: <br /> T rnI ID: T nk ID: L <br /> In-Tank Gauging Probe. Model: In-Tank Gauging Probe. Model: <br /> nular Space or Vault Sensor. Model: Z ❑ Annular Space or Vault Sensor. Model: <br /> Piping Sump/Trench Sensor(s). Model: Piping Sump/Trench Sensor(s). Model: <br /> Fill Sump Sensor(s). Model: X Fill Sump Sensor(s). Model: Z(� <br /> Mechanical Line Leak Detector. Model:��" -/jr,L(/) <br /> Mechanical'Line Leak Detector. Model: ^. 1"yO— <br /> ❑ Electronic Line Leak Detector. Model: _ ❑ Electronic Line Leak Detector. Model: <br /> ❑ Tank Overfill/High-Level Sensor. Model: ❑ Tank Overfill/High-Level Sensor. Model: <br /> ❑ Other(specify equipment type and model in Section E on Pa a 2). ❑ Other(speciLy equipment[ e and model in Section E on Page 2). <br /> ,T nk ID: G Tank ID: <br /> In-Tank Gauging Probe. Model: ❑ In-Tank Gauging Probe. odel: <br /> �❑.Annular Space or Vault Sensor. Model: ❑ Annular Space or Vault Sensor. odel: <br /> j ,'iping Sump/Trench Sensor(s). Model: 2 D.V ❑ Piping Sump/Trench Sensor(s). M d <br /> 7'Fill Sump Sensor(s). Model: _ ❑ Fill Sump Sensor(s). M I: <br /> Mechanical Line Leak Detector. Model:s, - ❑ Mechanical Line Leak Detector. od : <br /> ❑ Electronic Line Leak Detector. Model: ❑ Electronic Line Leak Detector. Model. <br /> ❑ Tank Overfill/High-Level Sensor. Model: ❑ Tank Overfill/High-Level Sensor. Model: <br /> ❑ Other(s)ecify equi ment type and model in Section E on Pace 2). ❑ Other(s eci a ui ment type and model in Section E on Pa'e 2). <br /> FDiseenser <br /> enser ID: 1' Di enser ID: <br /> ispenser Containment Sensor(s). Model ispenser Containment Sensor(s). Model: <br /> hear Valve(s). Shear Valve(s). <br /> Containment Float(s)and Chain(s). ❑ Dis enser Containment Float(s)and Chain(s). <br /> Di enser ID: s- <br /> Y Di, enser ID: <br /> 11 ispenser Containment 5ensor(s). Model: - ZO& Dispenser Containment Sensor(s). Model: 7r <br /> Shear Valve(s)' Shear Valve(s). <br /> ❑ Dispenser Containment Floats)and Chain(s). ❑ Dispenser Containment Float(s)and Chain(s). <br /> Dispenser ID: Dispenser ID: <br /> ❑ Dispenser Conti�inmentensor(s). odel: ❑ Dispenser Containment Sensor( oriel: <br /> ❑ Shear Valv ❑ Shear ser C n❑Dis enser Coat(s and ain(s). ❑ Dispenser Containment F at(s)a Chain(s). <br /> 11f the Facility contains more tanks or dispensers,copy this form. Include information for every tank and dispenser at the facility. <br /> C. Certification - I certify that the equipment identified in this document was inspected/serviced in accordance with the <br /> manufacturers' guidelines. Attached to this Certification is information (e.g. manufacturers' checklists) necessary to verify that this <br /> information is correct and a Plot Plan showing the layout of monitoring equipment. For any equi ent capable of generating such <br /> reports,I have also attached a copy of the report;(check till that applp): X-1 <br /> yste set-up Alarm history report <br /> Technician Name(print):��Vr i7 a , g Signatur <br /> Certification No.: 3yS)f" , t'e- <br /> License.No.: �•�L �n�-�'�� <br /> Testing Company Name: cyC b A 7g-5 r Phone No.:� i0q 'y�//,Z <br /> Site Address: �fd'� /. / p� Date of Testing/Servicing: /Z7/fly <br /> Monitoring System Certification Page 1 of3 <br /> 113/111 <br /> 9. Results cif Testslrn/Servichzg <br />
The URL can be used to link to this page
Your browser does not support the video tag.