My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2003 - 2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2185
>
2300 - Underground Storage Tank Program
>
PR0231118
>
COMPLIANCE INFO 2003 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 3:52:53 PM
Creation date
10/21/2019 3:25:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003 - 2008
RECORD_ID
PR0231118
PE
2371
FACILITY_ID
FA0003284
FACILITY_NAME
FOOD MART GASOLINE*
STREET_NUMBER
2185
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14113045
CURRENT_STATUS
01
SITE_LOCATION
2185 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In-Tani. Gauging/SIR I <br /> prnent: Check this box iftann gauging inQ <br /> ❑ Check this box if no tank gaugingis Lsed Only or SIR equipment isol inventory <br /> Iled control. <br /> This section must be completed if in-tank gauging equipment is used toerform leak k detection monitoring. <br /> Complete the foMWimg checklist- <br /> ❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing <br /> ❑ Yes ❑ No Were all tank gauging probes visually inspected for damage and residue buildgp? b for ground faults? <br /> ❑ Yes ❑ No Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water Level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalle11 d properly? <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how Ind when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Co fete gie followin checklist: <br /> Yes No* For equipment start-up or annual equipment ification, was a leak simulated to verify LLD erforma <br /> 11 N/A (Check all that apply) Simulated leak rate: 3 <br /> P.h-; ❑0.1 g.p.h; ❑0.2g-P•h P nce. <br /> Yes ❑ No* Were all LLDs confirmed operational and 13accurate within regulatory requirements? <br /> Yes No* Was the testing apparatus properly calibrated? <br /> Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> N/A <br /> ❑ Yes ❑ No For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> N/A or disconnected? <br /> ❑ Yes ❑ o* For electronic LLDS, does the turbine automatically shut off if any portion <br /> malfunctions or faof the monitoring system <br /> N/A fails a test? <br /> ❑ Yes ❑ o* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> /A <br /> ❑ Yes No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: ,f� 7 G 2 f�>�cy� �G L/✓�h <br /> XY <br /> Page 3 of 3 <br /> 03101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.