My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2003 - 2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2185
>
2300 - Underground Storage Tank Program
>
PR0231118
>
COMPLIANCE INFO 2003 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 3:52:53 PM
Creation date
10/21/2019 3:25:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003 - 2008
RECORD_ID
PR0231118
PE
2371
FACILITY_ID
FA0003284
FACILITY_NAME
FOOD MART GASOLINE*
STREET_NUMBER
2185
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14113045
CURRENT_STATUS
01
SITE_LOCATION
2185 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IED PROGRAM CONSOLIDATED F01F <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- (Page 1 of 2 <br /> TYPE OF ACTION ® 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION 491)- <br /> 1. <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2. <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) 1. <br /> BUSINESS NAME(Sante as Facility Name or DBA) Food Mart Gasoline 3 <br /> BUSINESS SITE ADDRESS 2185 Freemont Street 103 CITY Stockton 104. <br /> U. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> by the equipment manufacturers'instructions,or annually,whichever is more ErN494 Such work must be performed by qualified personnel.[23 ccR§2632,2634,263s,26411 <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY ❑ 99.OTHER(Specify): 4903&490-3b. <br /> M. MONITORING LOCATIONS <br /> ® 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ❑ 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED [23 CCR§2632,26341 490-4• <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S: "l`ecka' <br /> t apply) <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490-5- <br /> WITH AUDIBLE AND VISUAL ALARMS.[23 CCR§2632,26341 <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 490.6. <br /> PANEL MANUFACTURER: Veeder Root 490-7. MODEL#: TLS 350 490-8• <br /> LEAK SENSOR MANUFACTURER: Veeder Root 490"9• MODEL#(s): 794380-420 490-10. <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM UtiIiD TO MONITOR SINGLE WALL TANK(S).[23 ccR§26431 490.11. <br /> PANEL MANUFACTURER: 490-12. MODEL#: 490.13. <br /> IN-TANK PROBE MANUFACTURER: 490"14. MODEL#(S): 490.15. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILYNIGHTLY ❑ c.WEEKLY 490.16. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-11• <br /> PROGRAMMED TESTS: ❑ a.0.1 h. ❑ b.0.2 h. c.OTHERS 490-18. <br /> ......._.......__ g.p.h. _.g.p.h. ❑ (Specify): 490-19. _ <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION[23 ccR§2646.11 490.20• <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)M CCR§26451 TESTING PERIOD ❑ a.36 HOURS E] b.60 HOURS 490-21. <br /> 490.22- <br /> ❑ 5.TANK INTEGRITY TESTING PER[23 CCR§2643.11 490-23. <br /> TEST FREQUENCY: a.ANNUALLY 490-24. <br /> Q ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 0-90-28. <br /> El 99.99.OTHER(Specify): 490.27 <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) "heckalJ <br /> that apply) <br /> ® 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 490.28. <br /> [23CCR <br /> 36] <br /> §26361 SECONDARY CONTAINMENT IS: ® a.DRY Elb.LIQUID FILLED ❑ c.PRESSURIZED Eld.UNDER VACUUM 490-29. <br /> PANEL MANUFACTURER:Veeder Root 490-30 MODEL#: TLS 350 490-31. <br /> LEAK SENSOR MANUFACTURER: Veeder Root 49032. MODEL#(S): 794380-208 490-33. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ® a.YES ❑ b.NO 490'34. <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN ® a.YES ❑ b.NO 490-31. <br /> 2.MECHANICAL LINE LEAK DETECTOR(MILD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF 490-36. <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.[23 ccR§26361$' Vim•/Z 4.0 .2-p O a y <br /> MELD MANUFAcTURER(s):FE-Petro D / a ' L 490'3'• MODEL#(S): MLD � 4, t11j1.fj490-38- <br /> E] 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.[23 cCR§2636] 490-39. <br /> ELLD MANUFACTURER(S): 4900. MODEL#(S): 490-41. <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.M[NRVIUM ANNUAL 0.1 g.p.h. 490-42 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490.43, <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490-4°• <br /> ❑ 4.PIPE INTEGRITY TESTING. 490-45. <br /> Y TEST FREQUENCY: ^❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 4499046. <br /> ❑ 5.VISUAL PIPE MONITORING. 490.48• <br /> FREQUENCY: ❑ a.DAILY ❑ b.WEEKLY ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED" 490-49. <br /> .Aaowed for monitoring of unburicd cmergency generator fuel pipm�onty per HSC§25281.5(bx3) <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.[23 CCR§2636(ax3)] 490-50. <br /> ❑ 7.NO REGULATED PIPING PER HEALTH ANDSAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 490.51. <br /> _.._._...._.......... <br /> ...__..._. <br /> ❑ 99.OTHER(Specify) 0-9490-52. <br /> 0-83. <br /> UPCF UST-D(12/2007)-1/4 www.unidocs.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.