Laserfiche WebLink
.r <br /> 14. r/�C'Cti' 7z � <br /> Name of Supplier,Owner or Dealer Address No.and Street(s) City State Date of Test <br /> 5100 15. TANK TO TEST 16. CAPACITY From <br /> Station Chart <br /> r !!,, G`- L� By most accurate f' Tank Manufacturer's Chart <br /> �,Ar V, Nominal Capacity /! capacity chart available./� /�� U <br /> M <br /> O Identity by'position Gallons Gallons (—) <br /> u Company Engineering Data <br /> AIs there doubt as to True Capacity 7 U Q Charts supplied with petro TtfP <br /> IHx rts4.� Brand and Grade See Section"DETERMINING TANK CAPACITY" ElOther <br /> 17. FILL-UP FOR TEST Stick Readings Total Gallons <br /> to%in. Gallons ea.Reading <br /> Stick Water Bottom - <br /> before Fill-up Inventory <br /> to t/e In. Gallons <br /> �y/fTGR <br /> Fill up.STICK BEFORE AND AFTER EACH COMPARTMENT DROP OR EACH METERED DELIVERY QUANTITY <br /> Tank Diameter Product In full tank(up to fill pipe) <br /> mCn _U _ <br /> o _ <br /> W <br /> © 18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK ' VAPOR RECOVERY SYSTEM <br /> 01 X.N 'i n r1 See manual sections applicable.Check below and record procedure in log(26). i Stage I <br /> o N 1:1 Water in tank High water table in tank excavation [:] Line(s)being tested with LVLLT Stage II <br /> o D 00 m <br /> o <br /> N 21. TEMPERATURENOLUME FACTOR (a) TO TEST THIS TANK <br /> 19. TANK MEASUREMENTS FOR <br /> TSTT ASSEMBLY Is Today Warmer?l 1 Colder?1 J—°F Product in Tank_°F Fill-up Product on Truck_°F Expected Change( + or <br /> _ <br /> I <br /> Cn Bottom of tank to Grade*.................... 22. Thermal-Sensor reading after circulation S�� / 5V—°F <br /> Add 30"for 4"L _" digits Nearest <br /> Add 24"for 3"L or air seal ....... 23. Digits per°F In range of expected change t' <br /> digits <br /> Total tubing to assemble Approximate <br /> 24. �f! �lJ X r<GU y /C'�J _ �l�PL C gallons <br /> rs <br /> 20. EXTENSION HOSE SETTING total quantity in coefficient of expansion for volume changes4r"his tank <br /> TnnY fop to Ilrado' •.......•..•...•••. full tank(16 or 17) Involved product per°F <br /> • Extend hose on suction tube 6"or more / 6o I/ <br /> below their trip ..................................... 25. Cr.D�l�%G f = i L� g�76 �`7� This is <br /> volume change per°F(24) Digits per"F In test Volume change per digit. test <br /> 'If rill pilm extends above grade,use top of fill. Range(23) Compute to 4 decimal places. factor(a) <br /> 26, 30. HYDROSTATIC 31. 34. 38.NET VOLUME 39• <br /> VOLUME MEASUREMENTS IV) TEMPERATURE COMPENSATION ACCUMULATED <br /> LOG OF TEST PROCEDURES PRESSURE RECORD TO.001 GAL. USE FACTOR(a) CHANGES <br /> CONTROL EACH READING <br /> CHANGE <br /> 27 28 Temperature At High level record <br /> 29. Standpipe Level 32. 35. 3 . t <br /> in Inches Product in Product Change Computation Adjustment Total End Collection <br /> OQ( Record details o1 setting up AudtnA Graduate Replaced(-) Thermal Higher+ (c) . (a)= Volume Minus <br /> and running test.(Use full No. Beginning Level to Sensor Al Lo.Level compute <br /> -- <br /> length of line if needed. lower- Expansion+ Expansion(+)or p <br /> D � of which Before <br /> After Product Reading (c) Contraction- COniradi0n(-) Change ppr Hour <br /> TIME Reading Restored Reading Reading Recovered(+) N33(V)—N37(T) INFPAcriteria) <br /> (N hit <br />