Laserfiche WebLink
Name of Supplier Owner or Dealer Address No.and Strout(s) City late ate of Test <br /> 15. TANK TO TEST 16. CAPACITY From <br /> V �y Station Chart <br /> I p� 3 /� 000 By most accurate l0� d/ I�- Tank Manufacturer's Chart <br /> �_ Nominal Capacity capacity chart available <br /> emir O Idnnuty by pos n Gallons Gallons Company Engineering Data <br /> _� <br /> {/�� ///j Is there doubt as to True Capacity 7 ❑ �� Charts supplied with PPtTO jltP <br /> I_ Brand and Grade See Section"DETERMINING TANK CAPACITY" Other <br /> 17. FILL-UP FOR TEST Stick Readings Toter Gallons <br /> to t/o in. Gallons ea.Reading <br /> Stick Water Bottom �/,�r� <br /> Inventory <br /> before Fill-up__ __ <br /> to t/e in. Gallons <br /> - Wi9T�:iQ <br /> Fill up.STICK BEFORE AND AFTER EACH COMPARTMENT DROP OR EACH METERED DELIVERY QUANTITY <br /> Tank Diameter Product in full tank(up to fill pipe) <br /> �' b o OBS TF1 . F <br /> o W -1 18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK VAPOR RECOVERY SYSTEM <br /> = 0 0 085. (R/�1,/ <br /> CP <br /> � X n See manual sections applicable.Check below and record procedure in log(26). .�— stage I <br /> 00D _ C�. g <br /> ? Sta a II <br /> K ry � � 1 Water in tank ❑ High water table in tank excavation ❑ Line(s)being tested with LVLLT ❑ 9 <br /> D 0 < <br /> o rn 21. TEMPERATURE/VOLUME FACTOR (a)TO TEST THIS TANK <br /> N <br /> 0 19. TANK MEASUREMENTS FOR Is Today Warmer?I J Colder?I J—°F Product in Tank F Fill-up Product on Truck IF Expected Change( + or - ) <br /> Iv TSTT ASSEMBLY Cj <br /> N Bottom of tank to Grade*.................... 22. Thermal-Sensor reading after circulation 1` -/19 1�'F- °F <br /> Add 30"for 4"L ................. <br /> n digits Nearest <br /> Add 24"for 3"L or air seal ....... 23. Digits per°F in range of expected changed—'! <br /> digits <br /> Total tubing to assemble Approximate " <br /> 20. EXTENSION HOSE SETTING 24. �O-3�d x ,000 j�oa,3 = Sa c(X79 73 gallons <br /> total quantity in coefficient of expansion for volume change in this tank <br /> Tank top to grade-.................I................ " full tank(16 or 17) involved product per"F <br /> Extend hose on suction tube 6"or more G�Q �/C/ �j <br /> p � 25. _S, / it ! / 3 - 3y' ,019'1 7 r"7-� This is <br /> below tank to ..................................... _ <br /> volume change per°F(24) Digits per°F in test Volume change per digit. test <br /> If Fill pipe extends above grade,use top of fill. Range(23) Compute to 4 decimal places. factor(a) <br /> 26 30. HYDROSTATIC 31. 34. 38.NET VOLUME 39• <br /> LOG OF TEST PROCEDURES PRESSURE VOLUME MEASUREMENTS IV) TEMPERATURE COMPENSATION ACCUMULATED <br /> RECORD 10.001 GAL. USE FACTOR(a) CHANGES CHANGE <br /> CONTROL EACH READING <br /> 27 28 29. Standpipe Level 32. 35. 36. 37. Temperature At Nigh Level record <br /> Product in Product Cana Com Computation <br /> Adjustment Total End Deflection <br /> DATE Record details of settingu in Intoes h D P <br /> p Heading Graduate Replaced(-) Thermal Higher+ (c) x (e)= Volume Minus <br /> and running test.(Use full No. Beginning Level to Sensor Lower- Expansion+ Expansion(+)or At Low Level compute <br /> length of line if needed.) of which Before Alter Product Reading (c) Contraction- Contraction(-) Change per Hour <br /> TIME <br /> _(24 hr) Reading Restored Reading Heading Recovered(+) N33(Y)—N37(T) (NFPA criteria <br />