My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1986 - 2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2185
>
2300 - Underground Storage Tank Program
>
PR0231118
>
COMPLIANCE INFO 1986 - 2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 4:45:03 PM
Creation date
10/21/2019 3:46:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986 - 2001
RECORD_ID
PR0231118
PE
2371
FACILITY_ID
FA0003284
FACILITY_NAME
FOOD MART GASOLINE*
STREET_NUMBER
2185
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14113045
CURRENT_STATUS
01
SITE_LOCATION
2185 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14. <br /> Neme of Supplier,owns or Oaat.r Address No.and Street(s) Dale of Test <br /> Gtr Sure <br /> D 15. TANK TO TEST 16. CAPACITY From <br /> Z Station Chart <br /> urate <br /> By most acc <br /> N Nominal Capacity capacity chart avarta l Tank Manufacturer's Chart <br /> M w�O Identity by posdan Gallons bit_ <br /> j j Company Engineering Data <br /> At� Is there doubt as to True Capacity 7 <br /> I [_] Charts supplied with Petro jltP <br /> Grade Brand and Gda See Section"DETERMINING TANK CAPACITY" '+"' es•t° <br /> Other <br /> 17. FILL-UP FOR TEST Stick Readings Total Gallons <br /> Stick Water Bottom to 1/9 in. Gallons ea.Reading <br /> D n <br /> before Fill-up Inventory <br /> � to'h in. Gallons ' <br /> m <br /> X <br /> Fill up.STICK BEFORE AND AFTER EACH COMPARTMENT DROP OR EACH METERED DELIVERY QUANTITY <br /> y m <br /> cn C <br /> AQ <br /> M Tank Diameter Product in full tank(up to fill pipe) _ <br /> 4) 2 \�. <br /> z 0 18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK Observed API Gravity <br /> Sam VAPOR RECOVERY SYSTEM <br /> 1'1'1 See manual sections applicable-Check below and record Observed .,,am,p1c Tem:. <br /> Procedure in log(2s). Correct-ed API Gravity Stage I <br /> DO Water In tank High water table in tank excavation E] Lfne(s)being tested with LVLLT Stage II <br /> o n Z <br /> 19. TANK MEASUREMENTS FOR 21. TEMPERATURENOLUME FACTOR (a)TO TEST THIS TANK <br /> "'1 TSTT ASSEMBLY Is Today Warmer? 1 Colder?I I—°F Product in Tank_•F Fill-up Product on Truck_°F Expected Change( + or - ) <br /> N m Bottom of tank to Grade'................ — <br /> 100 Add 30"for 4"L ......... 22• Thermal-Sensor reading after circulation.... „ ti °FOrg,ts <br /> Z Add 24"for r L a Nearest <br /> W w sed <br /> 23. Digits <br /> O " , Total tubingto assemble Approximere .. per°F in range of expected change <br /> fie, „ digits <br /> 20. EXTENSION HOSE SETTING 24, x .000 gallons <br /> Tank top to grade.................... —„ total quantity in coefficient of expansion for volume change in this tank <br /> ) Involved product per°F <br /> full tank(16 or 17 <br /> Extend hose on suction tube e'a rtwre <br /> below tank top 25. <br /> • <br /> This is <br /> If Fill ape extends above grade-use too e" V <br /> ra volume change per°F(24) i Digits per•F in test Volume change per digit. test <br /> p Range(23) Compute to 4 decimal places. factor(a) <br />
The URL can be used to link to this page
Your browser does not support the video tag.