Laserfiche WebLink
SECTION 3 <br /> EVACUATION PROCEDURES <br /> A. EMPLOYEE EVACUATION <br /> Evacuation Leader: All of the employees are responsible to ensure the <br /> safety of other employees and the general public. <br /> Shift Hours Number of Employees <br /> 1. 1 5:30 a.m. - 1 :00 i).m. 1 <br /> 2 2 7:00 a.m. - 3:00 p.m. 1 <br /> 3. 3 2:30 p.m. - 10:30 p.m. 1 <br /> 4 5:30 p.m. - 10:30 p.m. 1 <br /> Method of Employee Notification (i.e., siren,public address system, verbal...) <br /> An employee will first notify, over the public address system or by <br /> voice, all other employees and the general public of the emergency. <br /> Evacuation Routes Posted: es No <br /> Assembly Area(s) for Evacuation. <br /> This is a small lot with a convenience store and gas dispensers, <br /> designated assembly area would not be practical for this operations <br /> layout and function. <br /> B. SURROUNDING OCCUPANCIES AND LAND USE WITHIN V8 MILE: <br /> (i.e., schools, hospitals,residential, commercial, open space...) <br /> North Residential <br /> South Residential <br /> East Vacant Lot <br /> West Commercial <br /> 4 <br />