Laserfiche WebLink
PERFORMED BY SACRAMENTO EQUIPMENT MAINTENANCE COMPANY, INC. <br /> 2533 CONNIE DRIVE - SACRAMENTO - CALIFORNIA - 95815 <br /> PHONE 916-925-2716 <br /> WORK ORDER # -58217 DATE <br /> SITE NUMBER: _1 /494 PRODUCT <br /> SITE NAME: RPar•nn STP BRAND _-- <br /> SITE ADDRESS: 9185 Frpmnnt <br /> gt.nrkhnn , CA <br /> RED JACKET LEAK. DETECTOR TEST <br /> PRODUCT RESULAP UNLEADED, PREMIUM-UNLEADED, DIESEL (CIRCLE ONE) <br /> NOTE: USE SEPARATE FORM FOR EACH TANK. <br /> 1) RUNNING PRESSURE <br /> 2 SHUT-OFF PRESSURE <br /> 3) AMOUNT OF PRODUCT RELEASED THRU BIBCOCK TO ZERO. _/ OZ. <br /> 4) WITH VALVE OPEN, START STP. LIS PRESSURE FSI. <br /> 5) REDUCE FLOW TO RATE OF 7 OZ. PER MINUTE. <br /> LIST PRESSURE AT THIS FLOW RATE PSI. <br /> 6) TURN STP OFF. LET PRESSURE DROP TO ZERO THRU LEAF: JUST <br /> CREATED. LIST TIME FOR GAUGE TO REACH ZERO. _ MIN.,ZU SEC. <br /> 7) TURN THE STP BACK. ON. KEEP LEAK. RATE AT BIBCOCK. <br /> LIST PRESSURE _e- PSI. FLOW RATE AT NOZZLE ) 2 GPM. <br /> 8) STOP LEAK. WITH STP STILL ON. <br /> DOES LEAF; DETECTOR RESET? YES NO <br /> IF YES, HOW LONG TO RESET? MIN. _ _ SEC. <br /> 9) TURN STOP OFF. LIST PRESSURE �� PSI. <br /> 10) TURN STP BACK ON. <br /> LIST TIME TO REACH PRESSURE RISE. MIN. SEC. <br /> 11) LIST PRESSURE a <n PSI. <br /> 12) OPEN NOZZLE AND LIST PRESSURE 62-62- PSI. <br /> 13) SATISFACTORY LEAK DETECTOR 1—YES NO. <br /> THIS TEST IS FOR LEAK DETECTOR SERIAL # _Db� IIIffSfol <br /> LEAF; DETECTOR <br /> (OLD) MODEL DATE CODE & SERIAL NUMBER / <br /> (NEW) MODEL DATE CODE & SERIAL NUMBER <br />