Laserfiche WebLink
(f) A generator or owner or operator authorized pursuant to Permit -by -Rule pursuant to Chapter 45 of this <br />division, Conditional Authorization pursuant to HSC 25200.3, or Conditional Exemption pursuant to HSC <br />25201.5, operating a non-RCRA underground tank system or an underground tank system otherwise <br />exempt from permitting requirements pursuant to the federal act, shall comply with the applicable standards <br />of Title 23 of the California Code of Regulations relating to underground tank systems. <br />(g) The tank system assessment shall include all of the following information: <br />(1) tank configuration (i.e., horizontal, vertical), and gross capacity (in gallons); <br />(2) design standard(s), if available, according to which the tank and ancillary equipment were constructed <br />and all of the following information; <br />(A) material of construction; <br />(B) material thickness and the method used to determine the thickness; <br />(C) description of tank system piping (material, diameter); <br />(D) description of any internal and external pumps; and <br />(E) sketch or drawing of tank including dimensions. <br />(3) documented age of the tank system, if available, otherwise, an estimate of the age based on owner or <br />operator knowledge; <br />(4) description and evaluation of the adequacy of any leak detection equipment; <br />(5) description and evaluation of any corrosion protection equipment; <br />(6) description and evaluation of any spill prevention or overfill equipment; <br />(7) hazardous characteristics of the waste(s) that have been or will be handled; <br />(8) description of any structural damage or inadequate construction or installation such as cracks, punctures, <br />or damaged fittings. All discrepancies shall be documented in the assessment and remedied before the tank <br />system is certified for use. <br />(9) results of a leak test, internal inspection, or other tank system integrity examination including the type of <br />integrity examination performed (i.e., ultrasonic, internal examination, volumetric tank test, pipeline pressure <br />test). Tank system integrity or leak test requirements must be in compliance with all local requirements. Prior <br />to conducting a tank system integrity test or leak test, contact local agency staff for local requirements. <br />(10) estimated remaining service life of the tank system based on findings of subsections (g)(1) through <br />(g)(9)• <br />NOTE: Authority cited: Sections 25150, 25159, and 58012, Health and Safety Code. Reference: Sections <br />25159 and 25159.5, Health and Safety Code; 40 CFR Section 265.191. <br />