Laserfiche WebLink
Hazardous Waste Tank System Requirements for LQGs and Onsite Treatment Facilities — Page 14 of 14 <br />Table 3 <br />Existing Tank System Assessment Deadliness <br />(Existing Tanks, Piping, and Ancillary Equipment Without Secondary Containment Required by 22 CCR §66265.193) <br />Type of Material Held in <br />Type of HazWaste <br />Te of Tank Sstem <br />ypy <br />Compliance Deadline <br />Tank System <br />Generator <br />and Code Citation" <br />Excluded Recyclable Material <br />Any <br />Any <br />7/1/199122 <br />CCR66265.191a)(^_)(A)l <br />Non-RCRA Hazardous Waste <br />LQG <br />Aboveground <br />1/24/1998 <br />generated on-site <br />122 CCR §66265.191(e)(1)I <br />Non-RCRA Hazardous Waste <br />LQG <br />Underground <br />7/1/1991 <br />22 CCR 66265.191 a 2 A <br />Tank system authorized <br />Non-RCRA Hazardous Waste <br />LQG <br />under CE, CA, or PBR on- <br />1/24/1998 <br />treatment permit tier <br />(22 CCR §66265.191(e)(1)]site <br />Non-RCRA Hazardous Waste <br />12 Months after the waste becomes <br />which becomes regulated as <br />LQG <br />Any <br />regulated as hazardous <br />hazardous after 7/1/1991 <br />[22 CCR §66265.191(c)(2)(A)] <br />RCRA Hazardous Waste <br />LQG <br />Any <br />1/12/1988 <br />[22 CCR §66265.191(a)(1)] <br />RCRA Hazardous Waste <br />12 Months after the waste becomes <br />which becomes regulated as <br />LQG <br />Anv <br />regulated as hazardous <br />hazardous after 7/14/1986 <br />[22 CCR §66265.191(c)(I)] <br />LQG exempted from 40 <br />CFR §265 per 40 CFR <br />1/24/19 4/19 98 <br />RCRA Hazardous Waste <br />§265.1 but still subject to 22 <br />Aboveground <br />[22 CCR § 191(e)(p] <br />CCR, Div. 4.5, Chapter 15, <br />Article 10 <br />LQG exempted from 40 <br />CFR §265 per 40 CFR <br />7/1/1991 <br />RCRA Hazardous Waste <br />265.1 but still subject to 22 <br />Anv <br />R2 CCR §66265.191(a)(2)(B)(2)l <br />CCR, Div. 4.5, Chapter 15, <br />Article 10 <br />LQG exempted from 40 <br />RCRA Hazardous Waste <br />CFR §265 per 40 CFR <br />12 Months after the waste becomes <br />which becomes regulated as <br />§265.1 but still subject to 22 <br />Any <br />regulated as hazardous <br />hazardous after 7/1/1991 <br />CCR, Div. 4.5, Chapter 15, <br />[22 CCR §66265.191(c)(2)(B)(2)] <br />Article 10 <br />15 Annual updating of the assessment was required until full secondary containment was provided. <br />UN -047-14/14 www.unidoes.org 02/01/07 <br />