My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
2025
>
2900 - Site Mitigation Program
>
PR0506438
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2019 11:02:14 AM
Creation date
10/31/2019 10:42:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0506438
PE
2960
FACILITY_ID
FA0007424
FACILITY_NAME
TEICHERT INDUSTRIAL LAND
STREET_NUMBER
2025
Direction
E
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
2025 E WEBER AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> II M <br /> GROUND ZERO ANALYSIS, INC. <br /> 2291 W. March Lane, Suite 127D <br /> Stockton, California 95207 <br /> Telephone: (209) 952-3481 l <br /> Facsimile: (209) 952-9892 } <br /> S 3 _ <br /> I. l <br /> i <br /> Subject to Attorney-Client and Attorney work product privileges <br /> April 12, 1996 l <br /> Ms. Jeanne Zolezzi f <br /> Neumiller & Beardslee <br /> s <br /> Post Office Box 20 j <br /> Stockton, CA 95201-3020 <br /> f , <br /> Re: Teichert Land Co. - London Produce Lease j <br /> jj <br /> Dear Jeanne, <br /> I am writing to summarize our assessment of all work performed at the subject site to date and <br /> to provide technical recommendations for future activities�l <br /> Currently the site is being used by the Pre-Cast Division of Teichert Construction. All London <br /> Produce operations ceased on the property in approximately September of 1994 and all tanks and <br /> other equipment were removed. The site was graded, however, no significant amount of soil ! <br /> material was removed from the site. <br /> Attachment I presents a detailed summary of site operational history and previous investigations, <br /> l <br /> along with the results of all previous soil and groundwater sampling performed on the property. <br /> Attachment II provides the results of our analysis of the water chemistry data from the site <br /> wells. Attachment III includes selected references. I, Attachment IV contains site and <br /> groundwater flow maps for reference. These attachments contain the primary data which we <br /> have relied upon to formulate our conclusions and recommendations for further actions at the <br /> site. j <br /> t <br /> 'J <br /> 'I <br /> i� <br /> i� <br />
The URL can be used to link to this page
Your browser does not support the video tag.