My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012489
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRENCH CAMP
>
25
>
2600 - Land Use Program
>
PA-1800259
>
SU0012489
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2022 10:18:37 AM
Creation date
11/5/2019 11:55:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012489
PE
2631
FACILITY_NAME
PA-1800259
STREET_NUMBER
25
Direction
E
STREET_NAME
FRENCH CAMP
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95206-
APN
19307002, 19302001
ENTERED_DATE
8/9/2019 12:00:00 AM
SITE_LOCATION
25 E FRENCH CAMP RD
RECEIVED_DATE
8/9/2019 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONDITIONS OF APPROVAL <br /> PA-1800043 <br /> JANET S. BLINCOE/BP WEST COAST PRODUCTS <br /> Site Approval No. PA-1800043 was approved by the Planning Commission on July 18, 2019. The <br /> effective date of approval is July 29, 2019. This approval will expire on January 29, 2021, which is 18 <br /> months from the effective date of approval, unless (1) all Conditions of Approval have been complied <br /> with, (2) all necessary building permits have been issued and remain in force, and (3) all necessary <br /> permits from other agencies have been issued and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT: (Contact Staff: Giuseppe Sanfilippo, [209]468-0227) <br /> a. BUILDING PERMIT: Submit an"APPLICATION-COMMERCIAL BUILDING PERMIT'. The Site Plan <br /> required as a part of the building permit must be prepared by a registered civil engineer or licensed <br /> architect. This Plan must show drainage, driveway access details including gates, on-site parking, <br /> landscaping, signs, existing and proposed utility services, and grading (refer to the "SITE PLAN <br /> CHECK LIST' for details). A fee is required for the Site Plan review. (Development Title Section 9- <br /> 884) <br /> b. APPROVED USE: A fueling station and convenience store to include the construction of a 3,180 <br /> square foot convenience store, a 1,152 square foot carwash, a 4,408 square foot fuel canopy, and <br /> a 1,355 square foot diesel canopy as shown on the revised Site Plan dated February 15, 2019 (Use <br /> Type: Gasoline Sales and Service-Combination) <br /> c. CAPITAL FACILITY FEE: This project may be subject to the Capital Facility Fee. If the Capital Facility <br /> Fee is applicable, the County shall collect the fees before the issuance of any building permits. <br /> (Development Title Section 9-1245.2) <br /> d. PARKING: Off-street parking shall be provided and comply with the following: <br /> (1) All parking spaces, driveways, and maneuvering areas shall be surfaced and permanently <br /> maintained with base material of appropriate depth and asphalt concrete to provide a durable, dust <br /> free surface. Bumper guards shall be provided where necessary to protect adjacent structures or <br /> properties. (Development Title Section 9-1075.6[i]) <br /> (2) A minimum of twenty-five (25) parking spaces shall be provided (Development Title Section 9- <br /> 1015.9) <br /> (3) Each parking stall shall be an unobstructed rectangle, minimum nine(9)feet wide and twenty(20) <br /> feet long. (Development Title Section 9-1015.5[b]) <br /> (4) All parking stalls and directional arrows must be delineated with paint. (Development Title Section <br /> 9-1015.5[d]) <br /> e. ACCESS AND CIRCULATION: The following requirements apply and shall be shown on the Site <br /> Plan: <br /> (1) Access driveways shall have a width of no less than twenty-five (25) feet for two-way aisles and <br /> sixteen (16) feet for one-way aisles, except that in no case shall driveways designated as fire <br /> department access be less than twenty (20)feet wide. (Development Title Section 9-1015.5[f][1]) <br /> PA-1800043 (SA) Conditions of Approval 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.